Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 109

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 11 months ago in InfoDrainage / Productivity 1 For Review

Calculating and adding the Froude number to storm table output

Many municipalities and utilities want to maintain subcritical flow in the storm sewer system and avoid hydraulic jumps. The Froude number is used to establish subcritical vs. supercritical flow.
Guest over 1 year ago in InfoDrainage / Reporting 2 For Review

Enable 3d view of two phases (foul and surface) simultaneously to help resolve clashes found in clash analysis.

Clash Analysis identifies pipes touching, which may be in different phases. The ability to view both phases in 3D View (as you can in Plan View) would make resolving the clashes much more efficient.
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Go To button to zoom to a certain pipe from the Connection table

In Civil 3D you can zoom to/select a pipe from the pipe table. It is very difficult to find specific pipes in InfoDrainage.
Daniel'le DeVoss about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

InfoSurge constant reporting interval

Often, different InfoSurge runs report results at different intervals, even though the simulation duration is the same. This makes it difficult to do comparisons of results. Please allow the user to set a report timestep like you can with a standa...
Colin Ricks 7 months ago in InfoWater Pro / Productivity 0 For Review

Use outflow from one phase as inflow into another phase.

When working on large, multi-phase projects in InfoDrainage, it is common practice to model each development phase in different InfoDrainage phases. However, challenges arise when runoff from one phase discharges into another. Currently, users mus...
Guest about 1 year ago in InfoDrainage / Data Exchange 0 For Review

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 11 months ago in InfoDrainage / Hydrology 0 For Review

Show manhole types in manhole schedule export

Manhole schedules need to feature cover types (D400, C250 etc), manhole types (Type A, B, C in Scotland etc) and whether they're a backdrop or a headwall etc. Having a feature to assign this based on location on site (cover type), depth to soffit ...
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

Allow no delay connections with a free flow outlet option instead of automatic orifice nodes.

Currently when flows from a pipe with a free outlet node is diverted to a different location via a no delay connection, the free flow outlet automatically changes into an orifice, which in fact does not exits there. This orifice also needs a manua...
Iwona Savas about 1 year ago in InfoDrainage 0 For Review