All ideas

Group InfoWater Pro pumps into a pump station object that aggregates results

As a modeler I want to summarize the behavior of a pump station of multiple pumps using a polygon. This helps me summarize energy usage and total flow without needing to select arbirary upstream or downstream objects. This also helps simplify syst...
Guest almost 5 years ago in InfoWater Pro / Operational Modeling 1 Gathering support

Could we add a preference to disable the popup to accept the most recent run data?

The popup is confusing, and we don't see a point in not accepting the latest run results.
Deb Smith over 1 year ago in InfoWater Pro / Productivity 2 Gathering support

Show worst case analysis on long sections

I would like to be able to see the worst case across multiple simulations (highest water levels) along the 1d network when reviewing results. Essentially being able to visualize statistical report results in a long section.
Guest over 5 years ago in InfoWorks ICM / Long Section / Profile / Results 1 Gathering support

Long-sections: Centre Geoplan on the selected link

It would be handy if the Geoplan centred on the selected link when selecting a long section. It seems every time select a long-section the windows split into two halves, one for the geoplan, the other for the long-section. As a result the link I j...
Benjamin Mauck over 5 years ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

Asymmetrical Tanks

Currently ICM treats storage areas where there is a change in area at a certain level as symmetrical. This limits hydraulic modelling by constraining the structures that can be built. An option to account for asymmetry would be useful ( similar to...
Guest about 1 year ago in InfoWorks ICM / Ponds/Storage 1 Will not implement

Project Planning

Roll up rehab actions into projects, where users can optimize the actions based on factors like proximity of the assets, overall cost, work packages, etc.
Mike Maylone almost 4 years ago in Info360 Asset 0 Under consideration

Background tasks overall progress visible in ICM

I think waiting for ICM to finish the task without having an idea about when this might be is not productive at all. Tasks like opening a simulation, graph something in the model, running a statistical template should be done accompanied by a load...
Ionut Pintea over 6 years ago in InfoWorks ICM / Performance 1 Gathering support

Add ability to use custom curve number tables other than the default TR-55

Many jurisdictions publish their own set of curve numbers for different land uses which they will expect to see during plan review. The local curve number sets often differ from TR-55. Please allow us to build custom curve number sets based on lan...
Guest about 1 year ago in InfoDrainage / Hydrology 1 For Review

Import selection lists from CSV

A simple request - can we have the ability to create csv files of selection lists that could then be imported into ICM?
Richard Body over 6 years ago in InfoWorks ICM / Productivity 1 Gathering support

Export statistical template results automatically as part of the manifest.

Particularly CSO spill statistics - enabling models to be run maybe weekly with historical data, the statistics exported - spill nr, duration and particularly predicted volume. This data can then be analysed in tools outside of ICMLive. This data ...
Geoffrey Brown almost 4 years ago in InfoWorks ICM / Live Modeling / Results 0 Gathering support