Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Using SWMM5 treatment equations at a node or link in ICM Networks

Users would like to use SWMM5 Buildup Washoff in ICM Networks AND the SWMM5 treatment equations at a node or link in the ICM St Venant solution. ICM SWMM networks have both options but for the purposes of using the powerful routing solution in I...
ROBERT DICKENSON over 5 years ago in InfoWorks ICM / Treatment / Water Quality 2 Gathering support

Update Scenario Explorer terminology to match Run Manager

Modelers can use the "General" tab in the IWP Scenario Explorer to assign specific Report, Simulation and Time options to a scenario. To avoid confusion, the label shown in the Scenario Explorer should be changed to match the Run Manager.
Michael Kane about 2 years ago in InfoWater Pro / Other 0 Gathering support

Store MSX data in Data Sets that could be used in DB Editor and Scenario Management

Currently, all MSX data like Initial Quality and Quality Source data is stored in the MSX model itself, which makes scenario management for MSX models very tedious. It would be much more intuitive and efficient if MSX data was stored in Data Sets ...
Grant Clemens about 2 years ago in InfoWater Pro / Water Quality 1 Gathering support

Adding references to Analytics

An analytic is created to be referred within other instance in the platform, whether another analytic or a workspace. When the analytic is created and later modified or deleted, the analytic owner must understand the impact of such modification or...
Javier Coronado over 1 year ago in Info360 Insight / Tools / Analytics 0 Gathering support

Add a feature for deselection of a group of elements in Geoplan

Many times we use polygon select feature to select elements in a particular extent, but there is no option of deselecting a small area within that selection - like in Arc Map
Ashwini over 1 year ago in InfoWorks WS Pro / Operations 1 Gathering support

Tariff Scheduling

Energy tariffs in water and wastewater treatment plants are often defined hourly by an energy operator. This correspondingly defines low- and high- tariff periods. When a customer desires to track energy consumption and estimate its cost through I...
Javier Coronado over 1 year ago in Info360 Insight / General 0 For Review

Analytics and Workplaces Ownership

When multiple users work in parallel, it is key to trace work changes. For example, if user A creates an analytic that must later be modified by user 2, both user2 and user1 must be aware of creation and modification ownership. This becomes critic...
Javier Coronado over 1 year ago in Info360 Insight / General 0 Under consideration

Infoworks ICM- Sewage Temperature Modelling and Heat Losses

The following features should be added to Infoworks ICM for modelling temperature impacts for Heat extraction or heat insertion projects: - Sewage temperature to be added in WWG file as a pollutograph parameter and can also be defined in a diurnal...
Guest almost 6 years ago in InfoWorks ICM / Temperature / Wastewater 1 Gathering support

Relinking inspections to their media after deletion and re-import

Deleting and re-ingesting inspections that have already had their associated media imported into Info360 Asset WILL NOT result in the media re-linking to the inspections. This is a SERIOUS flaw in the management of CCTV inspections and associated ...
Tony Andrews over 1 year ago in Info360 Asset 0 Gathering support

Creating Demand scaling from the Demand Area Window

In 2024.5 it is possible to choose to 'ignore leakage' and to 'scale demands' when using the demand area analysis tool. The scaling is happening on the demand (consumption) in the network. This means I have to create a new network (or scenario) ev...
Caroline Heylen over 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support