Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Improve H2S Transformation Modelling

You need to improve the representation of wastewater transformation processes. The empirical equations implanted in InfoWorks ICM have limitations and you need to build in more complex representation as part of forward product development.
Guest 4 months ago in InfoWorks ICM / Water Quality 1 For Review

Add Option for Rectangular Orifices

It would be great to be able to model orifices as either circular or rectangular like it is in XPSWMM. Currently, the workaround is to enter the rectangular orifices as sluice gates, but I'm not sure if this is the intended use of sluice gates.
Karen Chu 8 months ago in InfoWorks ICM / Orifice 2 Gathering support

Allow buildings to connect to multiple nodes with specified roof area percentages

In existing urban areas, especially during road reconstruction projects, we often face situations where only part of a roof can be disconnected from the foul system. Currently, in InfoWorks ICM, a building object can only be linked to a single nod...
Coen Maas 11 months ago in InfoWorks ICM / Hydraulics 1 Gathering support

possibility to connect labels to links at the beginning or end instead of only in the middle of the link

This way you can show that link invert levels on a manhole differ in value or deviate from the chamberfloor
Loes van der Linden over 1 year ago in InfoWorks ICM / Labels 3 Already exists

Create channel section lines from points

Survey data for river sections is often delivered as point data. To be able to create a model in ICM from this it needs to be converted into a line. This functionality was available in RS.
Guest over 3 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Remove Need to Validate When Changing Background Layers

Suggest that a network not need to validated or show that it was edited (red circle) for only switching on/off a background (e.g., aerial)layer would be appreciated. Keeping scenarios straight is tough enough w/out the additional heart attack when...
Guest almost 5 years ago in InfoWorks ICM / Productivity / Validation 3 Will not implement

Convert 3d points from Civil 3D to cross section lines

River survey sections are provided as 3d points in a DWG file. These need to be converted to channel sections which needs to be done manually. There was previously a feature in RS that allowed the conversion.
Sophia Buchanan over 2 years ago in InfoWorks ICM / Import data 0 Gathering support

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Dave White almost 7 years ago in InfoWorks ICM / Productivity 4 Gathering support

Validation as a background task

Validation as a background task so UI isn't locked.
Guest almost 7 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Expand gauged object results to all result fields

Currently the gauged object result fields are limited. For instance, they do not include 2d related results at nodes. As the use case for ICM has expanded so has the information that users are interested in. No longer as they just looked at 'flow ...
Alex Grist almost 2 years ago in InfoWorks ICM / Results 3 Under consideration