Account for multi-connection properties during criticality analysis

Some hospitals for example have multiple service laterals connecting them to the network. If one line is cut off from service due to a repair, the hospital can still get water. As a result, criticality is overestimated when this logic is ignored. ...
Nathan Gerdts over 1 year ago in InfoWater Pro / Other 0 Gathering support

Apply two-valve isolation for criticality analysis

For some projects we need to isolate the repair area with two closed valves in all directions in case one valve were to fail. Please incorporate this as an option in criticality analysis when summing affected customers
Nathan Gerdts over 1 year ago in InfoWater Pro / Other 0 Gathering support

Zoom to domain when inactive facilities selected

When inactive facilities are included in the domain, clicking the "Zoom domain" button only zooms to the extent of the active facilities in the domain. If only inactive facilities are part of the domain (no active facilities at all), then this but...
Colin Ricks almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

New Feature is Active in All Scenarios Option (InfoWater/Pro)

Add a tools/options option so when you add new features they will be active in all scenarios, instead of getting errors 100 times for every scenario you try to run where the features were not included originally. This would be especially useful wh...
Guest about 4 years ago in InfoWater Pro / Productivity 0 Gathering support

inlet riser option for tank

Have an option to specify an Inlet Riser Pipe for the tank element. This would hold the fill head at a constant, set at the riser pipe elevation, but allow the tank discharge head vary with the tank level.
Guest about 4 years ago in InfoWater Pro / Engine 0 Gathering support

Report volume stored in all tanks

I can calculate volume from level, but it's an extra step and requires that I copy the run results out to Excel. It's even more difficult if I have a non-circular tank. Please include tank volume in the tank results and in the "System Demand" report.
Colin Ricks over 4 years ago in InfoWater Pro / Productivity 1 Gathering support

I would like more informative error messages when trying to Change an ID

I tried to change the ID for a pump, but I overlooked the “Target Element Type” dropdown, which was automatically set to junction. It took me a while to realize my mistake. It might be helpful to other users if the error messages/warnings (see be...
Guest over 4 years ago in InfoWater Pro / Productivity 0 Gathering support

Automatically autofit DB table column widths

No description provided
Colin Ricks about 5 years ago in InfoWater Pro / Productivity 1 Gathering support

Automate concurrent Fireflow simulations

When you integrate InfoWater into the InfoWorks platform, it would be great if you could ensure that FireFlow simulations can be scheduled and automatically run sequentially for different network scenarios. As far as I am aware this is not possibl...
Guest about 5 years ago in InfoWater Pro / Engine 0 Gathering support

For fire flow simulations, I would like to have range reports for pipes, valves, pumps, reservoirs, and tanks.

For example, I would like to know the maximum, minimum, and average velocity through each PRV across all fire flow runs in a simulation.
Guest over 5 years ago in InfoWater Pro 0 Gathering support