Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks WS Pro

Showing 63

The ability to create multiple Selection Lists at once

I am currently working on a model with a large number of DMAs. This means I have to select each specific area, and save this as a selection list - so I can easily identify areas in the future. This is a very time consuming task, and the ability to...
Sam Bonnington over 1 year ago in InfoWorks WS Pro / Automation 1 Gathering support

Node Name Generation Default

In WS PRO it would be great to be able to set Node Name Generation format as a default for all networks in a database instead of having to enter it in every time I want to add nodes to a network
Guest about 5 years ago in InfoWorks WS Pro 0 Gathering support

Network Schematic for interaction with InfoWorks WS Pro models

I want to interact with my distribution network in a simplified schematic view, which displays DMA's and important control objects like pump stations and reservoirs. Software should be able to update the schematic based on changes to network conne...
Guest over 3 years ago in InfoWorks WS Pro 0 Gathering support

user defined boolean fields

Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system
Richard Robinson about 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Set Area Codes- InfoWorks WS Pro

Add an "Exclude Selection List" option to the "set Area Codes" tool in IW WS Pro so that you can exclude selected links from the area code trace.
Guest about 5 years ago in InfoWorks WS Pro 1 Gathering support

Insufficient channel modeling

Impossibility of simulating the operation of a "real" channel with different sections created by different cameras: derivation, shipones, ...
Juan Carlos Ortega almost 2 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest almost 5 years ago in InfoWorks WS Pro 0 Gathering support

Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction

Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger nega...
Guest about 4 years ago in InfoWorks WS Pro / Other 0 Gathering support

To be able to graph refill/depletion rate and/or survival time on reservoirs and towers

in WS Pro
Guest over 4 years ago in InfoWorks WS Pro 1 Gathering support

WS Pro to allow for maxconc at node/hydrant

No description provided
Guest over 4 years ago in InfoWorks WS Pro / Water Quality 1 Gathering support