Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 135

Retain company logo in Hard Copy Headings

Company logo/attached image currently disappears from Hard Copy Headings after closing and reopening InfoDrainage. Other headings are retained. The image should also be retained when the file is reopened.
Daniel'le DeVoss almost 2 years ago in InfoDrainage / Reporting 2 Gathering support

Cumulative Inflow Areas Against Junctions and Connections Results

In order to aid the quality assurance process that exists throughout drainage design, it would make life much simpler to have a cumulative contributing inflow area against junction summaries. Being able to sense check results with the contributing...
Guest 10 months ago in InfoDrainage / Reporting 2 Gathering support

Add an option to automatically Refresh All graphs in the Report Manager after a new run.

Currently when you complete a new run you have to remember to hit Refresh All in the Report Manager to see latest results. The use-case for viewing old run results is rare, so having an option to automatically refresh all graphs and tables would b...
Grant Clemens almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Junction Loss

There need to be more options for calculating junction loss. Having values for entry and exit loss isn't enough. Recommend HEC-22 and AASHTO at a minimum.
Guest over 1 year ago in InfoDrainage / Hydraulics 2 Gathering support

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg almost 2 years ago in InfoWater Pro / Other / Productivity 0 Gathering support

InfoSurge velocity results

Please add pipeline velocities to the results for surge simulations. This really helps when designing surge tanks and connecting pipelines.
Guest 12 months ago in InfoWater Pro / Engine 1 Gathering support

More informative Analysis Error messages in InfoDrainage

A common error in InfoDrainage is "The analysis has encountered an error and has been stopped." with no additional troubleshooting guidance, or hints about where the error originated. See some of the typical causes here: It would be helpful to hav...
Daniel'le DeVoss 8 months ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

Steady state simulations for different times or for average demand

Steady state simulations are useful for 1) evaluating an initial or simplified version of a model (for example with average demands) or 2) evaluating a specific condition (like maximum demand, etc.) without much complexity. If your model is alread...
Felipe Hernandez 8 months ago in InfoWater Pro / Engine 0 Gathering support

Pipe level difference in properties window

Pipe level drop (distance between upstream invert level and downstream invert level) is not listed in pipe properties (as it previously was in MicroDrainage). It would be useful as a designer may want to target a specific level drop rather than an...
Ian George 4 months ago in InfoDrainage 0 Gathering support

CAD Data Layer Controls

When you have your CAD files in the drawing, you can control what layers show up. However, you can only select one at a time, you can't sort, and often your selections will reset. This would improve the plan view controls quite a bit.
Jess Ewing about 2 years ago in InfoDrainage / Visualization 1 Gathering support