Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 868 of 1442

Right click menu on objects to graph, trace, edit, etc. Similar to ICM

I want to interact with my model primarily from the map rather than relying on toolbars. Namely, I want to select an object and then access an action menu to graph, edit, trace, label, etc on that object. Note: ICM already supports this feature, s...
Nathan Gerdts 11 months ago in InfoWorks WS Pro / Productivity 0 For Review

Integration with Industry Cost Data (E.g. RSMeans) for Rehab Costs & Updates

Integrate with industry cost data source like RSMeans. User can link their rehab actions to labor, equipment, material costs which will automatically be keep updated by region.
Mike Maylone over 1 year ago in Info360 Asset 0 Gathering support

Apply RTC / observed values to Sluice Linear Structures

At the moment we cannot move sluice linear structures in 2D. We're wanting to model a river entirely in 2D but the river is subject to a series of barrages that would require control. Therefore it would be essential to apply RTC and observed setti...
Richard Body about 6 years ago in InfoWorks ICM / River Modeling / RTC 0 Gathering support

Enable the ability to review Debug Logs from external text editor

The internal Log results editor window is slow when loading over 100K lines. Needless to say - debugging a model where the debug log is 11 GB cant be done in the product, and the workflow to export to file is simply excruciatingly painful. As the ...
Guest over 2 years ago in InfoWorks ICM / Productivity 1 Gathering support

As a user, I need to burn the 1D river into ground model, so the flooding extent inside the 1D river channel is shown accurately

HEC-RAS has a tool in RAS Mapper doing just that. https://www.kleinschmidtgroup.com/ras-post/including-channel-bathymetry-into-your-terrain/
Guest over 5 years ago in InfoWorks ICM / Terrain 2 Gathering support

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Allow Simulation Time and Reporting Time to set independently

Similar to the functionality available InfoWSWMM where you are able to define a start date and time for the simulation and a start date and time for results. This allows initial phases of the model simulation to be ignored by the results without n...
Guest almost 2 years ago in InfoWorks ICM / Simulations 2 Gathering support

Provide min_time_step on 2D results mesh

In an effort to speed simulations up - it would be helpful to know what mesh elements are slowing down a 2D simulation. A single Job Progress value is insufficient to chase down which of these 200K mesh elements is slowing down the model.
Guest over 2 years ago in InfoWorks ICM / Results 1 Gathering support

Long Section to AutoCAD DWG

As the Alternative Results in the Long Section are bogus (they are not Level or height above datum) instead are displayed as depth above invert) - we need a better way to compare existing simulation results and proposed results in a long section. ...
Guest over 1 year ago in InfoWorks ICM / Productivity 1 Will not implement

Bank marker distinctions

It would be good if cross sections for rivers could be marked with left and right bank markers within the cross sections themselves.
Guest about 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support