Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 146

Templates for GMR Config Objects

We have a large team of modelers that manage many different GMR runs. It's important to keep the Output and Analysis options matching between these runs.We want to manage a central template to define and control consistent options between many GMR...
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Make Scenario Explorer window panes resizable to see long Data Set names

When you resize the Scenario Explorer window, the left side with the Scenarios gets larger but the right side with Data Set / Facility / General tabs does not widen, so you can't see long Data Set names without opening a separate window.
Grant Clemens over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Design ARV & Washout size - Simulate losses & airflow during system drain down

As a planning and design team, we need to size air valves and wash outs for our system so that large pipes can be drained for maintenance in a timely manner. InfoWorks WS Pro models the draindown of water after isolation, but it doesn't take into ...
Nathan Gerdts 6 months ago in InfoWorks WS Pro / Operations 1 Gathering support

Upstream and Downstream Trace Icons are misleading

Minor annoyance here and possible solution- can you change the icons for the upstream and downstream trace to actually be meaningful? at the moment both icons represent downstream and upstream trace at the same time and it doesn't make sense
Daniel Alexander 9 months ago in InfoWorks WS Pro / Other 1 Gathering support

Expand Primary Key Fields to Support UUIDs

It would be helpful to use UUIDs as primary/secondary key fields for row objects for data exchange with other GIS databases. It could also be a better way of generating new IDs than the default approach of sequential numbers, which cause problems ...
Dave Watts 10 months ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Add an option to automatically Refresh All graphs in the Report Manager after a new run.

Currently when you complete a new run you have to remember to hit Refresh All in the Report Manager to see latest results. The use-case for viewing old run results is rare, so having an option to automatically refresh all graphs and tables would b...
Grant Clemens almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Quick view graph docked in Results Properties Panel

When reviewing models, I want a quick view graph of any selected object in a docked location to review. The results Properties Panel could be a potential location. I want to be able to switch through to select which output is being displayed on th...
Nathan Gerdts 10 months ago in InfoWorks WS Pro / Productivity 0 Gathering support

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg almost 2 years ago in InfoWater Pro / Other / Productivity 0 Gathering support

InfoSurge velocity results

Please add pipeline velocities to the results for surge simulations. This really helps when designing surge tanks and connecting pipelines.
Guest 12 months ago in InfoWater Pro / Engine 1 Gathering support

Steady state simulations for different times or for average demand

Steady state simulations are useful for 1) evaluating an initial or simplified version of a model (for example with average demands) or 2) evaluating a specific condition (like maximum demand, etc.) without much complexity. If your model is alread...
Felipe Hernandez 8 months ago in InfoWater Pro / Engine 0 Gathering support