Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 769

Units for catchment area: add km²

The choice of display units of the catchment area (under Tools--> Options--> Units) is now limited to ha or acre, which is not convenient for our river subcatchments. It would be useful to add the possibility of km².
Michael Huybrighs over 2 years ago in InfoWorks ICM / Other 0 Gathering support

Add time/factor graph to SWMM time patterns editor

Trade waste and wastewater events include a graph showing the factor at each time. SWMM time patterns should also include this graph for interrogation of data.
Guest over 1 year ago in InfoWorks ICM / SWMM 2 Gathering support

Long-sections: Centre Geoplan on the selected link

It would be handy if the Geoplan centred on the selected link when selecting a long section. It seems every time select a long-section the windows split into two halves, one for the geoplan, the other for the long-section. As a result the link I j...
Benjamin Mauck almost 5 years ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

Infoworks - Pipe grade calculator

Pipe grade calculator between US and DS inverts, Ultimately having the ability to calculate downstream or upstream inverts over a long network based on a specified grade from either a DS or US invert level as a starting point.
Guest almost 6 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWater Pro / Operational Modeling 0 Gathering support

Attach document for reference when creating a scenario

See attached picture. When I create a new scenario, I would like to attach documents, like email message from line manager who requested to simulate this scenario, or drawings,.......etc. This will help me to remember after long time why I did thi...
Mohammed Abdallah over 1 year ago in InfoWorks WS Pro 0 Gathering support

Ability to snap to DWG or GIS background layers

When moving a manhole, I would like to snap to drawing geometry
Guest over 3 years ago in InfoWorks ICM / Productivity / Visualization 0 Gathering support

Easier to interrogate log results file

In the review of a model we use the log results to identify whether the model has particular problems and review the overall mass balance. The log results are in text format and it is fairly annoying scrolling through the find the items needed. Co...
Guest over 2 years ago in InfoWorks ICM / Reporting 1 Gathering support

Background tasks overall progress visible in ICM

I think waiting for ICM to finish the task without having an idea about when this might be is not productive at all. Tasks like opening a simulation, graph something in the model, running a statistical template should be done accompanied by a load...
Ionut Pintea almost 6 years ago in InfoWorks ICM / Performance 1 Gathering support

InfoAsset Manager: Create blob fields for a Custom Object

Whilst it is possible in InfoAsset Manager to create Custom Objects, it is not possible to create a blob field on a Custom Object in such a manner similar to the CCTV or Flood Defence Survey's Details blob field. It would be useful if the Custom ...
Guest over 4 years ago in Other Product Ideas / Asset Management 0 Gathering support