Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoDrainage

Better hydraulic representation of flow in permeable paving

Flow through permeable paving does not occur as one would expect. Is greatly affected by the shape and direction the paving is drawn in InfoDrainage. When drawing an irregular shape the hydraulic grade lines appear incorrect, with flow all at one ...
Guest about 2 years ago in InfoDrainage / Hydraulics 0 For Review

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest about 2 years ago in InfoDrainage / Productivity 1 Gathering support

Multiple Pipe Networks in One Phase

When exporting from Civil3D to InfoDrainage, if I have multiple pipe networks they all export in separate phases. It would be very helpful to be able to export multiple pipe networks into a single phase of InfoDrainage. This would improve useabili...
Guest about 1 year ago in InfoDrainage / Civil3D Integration 2 Gathering support

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss about 2 years ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest about 2 years ago in InfoDrainage / Auditing / Reviewing 0 For Review

Add Simple Index Approach tool to InfoDrainage

It would be good if we we can get the "Simple Index Approach" tool inside InfoDrainage.
Dilraj KT about 3 years ago in InfoDrainage / Other 1 Gathering support

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest about 2 years ago in InfoDrainage / Hydraulics 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest about 2 years ago in InfoDrainage / Productivity 0 For Review

Update downstream pipes

It would be useful to have an option to upsize downstream pipes automatically (just like microdrainage). For example, if i increase pipe size the corresponding downstream pipes should upsize accordingly so not to cause a restriction. At the minute...
Guest over 3 years ago in InfoDrainage / Productivity 2 Already exists

Basin / Swale inlets pick up IL at point of entry, not the bed level

Inlets automatically pick up down stream bed level of SWC. Inlet pipes have to be locked, with the IL's calculated manually which can be difficult to get right along a basin or swale that is long and winding. Would it be possible for the IL pipe t...
Guest over 2 years ago in InfoDrainage / Productivity 0 For Review