Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 368 of 1442

Add ability to rename datasets, patterns, queries, etc

1. Allow the "Change ID" tool to rename datasets, patterns, queries, etc. 2. Make the "Change ID" window wider or resizeable to fit longer IDs.
Colin Ricks over 6 years ago in InfoWater Pro / Productivity 1 Gathering support

Group InfoWater Pro pumps into a pump station object that aggregates results

As a modeler I want to summarize the behavior of a pump station of multiple pumps using a polygon. This helps me summarize energy usage and total flow without needing to select arbirary upstream or downstream objects. This also helps simplify syst...
Guest over 4 years ago in InfoWater Pro / Operational Modeling 1 Gathering support

Point and line source objects for flooding 2D Analysis

I would like to assess the site and drainage network for flooding from a particular source that does not originate from a surcharged network. ICM has both of these objects available. The idea would be to connect a base flow, hydrograph or catchmen...
matthew.piggott about 1 year ago in InfoDrainage / 2D Flooding 0 For Review

Import EPASWMM5 Files

Importing EPASWMM5 files for US users would help to streamline the transition from SSA (you can export to SWMM5 from SSA)
Guest over 3 years ago in InfoDrainage 4 Under consideration

Flow Path (Profile Plots)

Would love a plot setting to show which design storm is being run as it relates to the max. water level
Jess Ewing about 2 years ago in InfoDrainage / Reporting 2 Gathering support

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc
Guest over 2 years ago in InfoDrainage / Reporting 3 Gathering support

Insert contours at regular intervals instead of "double pegs"

Currently, contours can be added at irregular intervals by using the "double pegs" function in InfoDrainage. In reality, contours are always placed at regular intervals, such as a major contour at every 10 ft or 5 ft of elevation. The option to ad...
Daniel'le DeVoss about 2 years ago in InfoDrainage / Visualization 1 Gathering support

Lock pipe diameters only.

After simulation and there is flooding, trying to upsize the pipes, if the wizard is run again it reverts to the previous diameter, i dont want to lock (ALL) as i still want to use the wizard to lower the inverts etc, downstream.
Steven Gilchrist about 2 years ago in InfoDrainage / Hydraulics 3 Gathering support

Adding Sediment Basin Design Function

It would be helpful if we can design sediment basins in infodrainage as another stormwater control and phase
Jenna Woyner about 2 years ago in InfoDrainage / Other 2 Will not implement

Adding interception and evaporation losses to Permeable Pavements, Bioretention systems etc.

There is currently no option to consider depression storage, interception and evaporation losses while modelling SuDS components such as Permeable Pavements, Bioretention systems etc in InfoDrainage. The option was available in MicroDrainage and i...
Dilraj KT over 2 years ago in InfoDrainage / Hydrology 1 Gathering support