Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoDrainage

Showing 63

Perforated Pipe as Connection Type

I would like to be able to model a perforated pipe as a connection type rather than use an infiltration trench and short branches of pipes to connect them to other stormwater controls. These infiltration trenches are not collecting inflow from sur...
Midori Patterson almost 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Cumulative Inflow Areas Against Junctions and Connections Results

In order to aid the quality assurance process that exists throughout drainage design, it would make life much simpler to have a cumulative contributing inflow area against junction summaries. Being able to sense check results with the contributing...
Guest 6 months ago in InfoDrainage / Reporting 2 Gathering support

More informative Analysis Error messages in InfoDrainage

A common error in InfoDrainage is "The analysis has encountered an error and has been stopped." with no additional troubleshooting guidance, or hints about where the error originated. See some of the typical causes here: It would be helpful to hav...
Daniel'le DeVoss 4 months ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

Provide Enhanced Manhole Schedule Details

It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules. As an example including practical details around the cover – contractors want to know and see more from a MH s...
Guest about 3 years ago in InfoDrainage 1 Gathering support

Modelling intermediate check dams and weirs in open channels including ponds ands swales

Currently, InfoDrainage only allows modeling of check dams or weirs at outlets. For open channels with multiple intermediate check dams, users must split the channel into sections, each with its own outfall defined. A more accurate feature allowin...
Dilraj KT over 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Retain company logo in Hard Copy Headings

Company logo/attached image currently disappears from Hard Copy Headings after closing and reopening InfoDrainage. Other headings are retained. The image should also be retained when the file is reopened.
Daniel'le DeVoss over 1 year ago in InfoDrainage / Reporting 2 Gathering support

Display Inflow catchment areas to 3 decimal places in plan view

Displaying network information in plan view, which is displayed when exported to CAD is great, however the decimal rounding is only to 2 decimal places. It would be good for the display to be rounded to 3 decimal places so it can be easily correla...
Guest 6 months ago in InfoDrainage / Visualization 0 Gathering support

Junction Loss

There need to be more options for calculating junction loss. Having values for entry and exit loss isn't enough. Recommend HEC-22 and AASHTO at a minimum.
Guest over 1 year ago in InfoDrainage / Hydraulics 2 Gathering support

CAD Data Layer Controls

When you have your CAD files in the drawing, you can control what layers show up. However, you can only select one at a time, you can't sort, and often your selections will reset. This would improve the plan view controls quite a bit.
Jess Ewing over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Catchment area in different colour

currently the catchment area demarcation gives only a common colour at all area. we need to allow catchment area in different colors to demark Paved, unpaved, Road in details while we represent the details to client
Guest almost 2 years ago in InfoDrainage / Visualization 1 Gathering support