Building Objects and Damage Receptors

https://www.fema.gov/grants/guidance-tools/benefit-cost-analysis/full-bca#download Need better support for Buildings to follow USACE BCA analysis
Guest over 1 year ago in InfoWorks ICM / 2D Flooding 1 Gathering support

Update French rainfall to include multiple durations

Ability to add more than 1 duration per return period in a single rainfall object. There are 3 sets of parameters for durations 6 < t < 60, 60 < t < 360 and 360 < t < 24hr. It would be useful to be able to add these parameter...
Guest almost 3 years ago in InfoWorks ICM / Rainfall 1 Gathering support

Sediment depth variable for Storage nodes

It appears that amounts of sediment are carried along when water is overflowing over the banks of the river: part of the sediment from sediment fractions SF1 and SF2 leaves the river and goes to the Storage Areas during flooding. Although this is ...
Edith Maroy almost 3 years ago in InfoWorks ICM / Sediment / Simulations 0 Gathering support

Infoworks - Pipe grade calculator

Pipe grade calculator between US and DS inverts, Ultimately having the ability to calculate downstream or upstream inverts over a long network based on a specified grade from either a DS or US invert level as a starting point.
Guest over 5 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Order ARR19 Box and Whisker plots by duration

The box and whisker plot outputs order alphabetically. It would be useful if it ordered based on rainfall event duration instead.
Guest almost 3 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Transportabele database (.icmt) containing an earlier version of the commited network without losing the commit history

For the moment we can only 'branch' an earlier version from the commit history interface or 'copy' this earlier version. - the branch can't be disconnected from the 'mother' network - the copy looses the commit history It would be nice to deliver ...
Pieter Snoeck over 4 years ago in InfoWorks ICM / Data Exchange / Export Data / Transportables 0 Gathering support

Background tasks overall progress visible in ICM

I think waiting for ICM to finish the task without having an idea about when this might be is not productive at all. Tasks like opening a simulation, graph something in the model, running a statistical template should be done accompanied by a load...
Ionut Pintea almost 6 years ago in InfoWorks ICM / Performance 1 Gathering support

Import selection lists from CSV

A simple request - can we have the ability to create csv files of selection lists that could then be imported into ICM?
Richard Body almost 6 years ago in InfoWorks ICM / Productivity 1 Gathering support

Wide "Oval" shape ID

conduit shape ID "Oval" only allows Height > With. So for "horizontally" wide oval conduits a new conduit shape has te be defined. It would be practical if the standard "Oval" also allows a with greater than the hight.
Guest almost 6 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

RTC Debugging Interface and Support

It would be really useful to have a debugging module for the RTC components in InfoWorks ICM so that one can go step by step through a simulation to display in simulation RTC values-things like variable values (e.g. timers), range/logic values, ac...
Guest over 4 years ago in InfoWorks ICM / API / Exchange / RTC 1 Gathering support