Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 868 of 1442

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest over 4 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support

InfoAsset Manager - Add more reports to Ruby Exchange method

Currently Ruby supports the following generation of reports:The Reports which are supported and generated via this method are: Manhole Report - ['cams_manhole',nil] Manhole Survey Report - ['cams_manhole_survey',nil] CCTV Survey Report - ['cams_cc...
Anthony Andrews 5 months ago in Info360 Asset / Reporting 0 For Review

Update Custom Graph functionality to cover more results

The current custom graph options, including Observed/Predicted and Flexible reports don't cover the full range of results available inside of ICM. This makes creating graphs and reporting the results difficult especially in the River and Water Qua...
Alex Grist over 1 year ago in InfoWorks ICM / Reporting 1 Gathering support

Moving multiple nodes and links simultaneously

The “Move Nodes” option under GeoPlan > Geo Plan tools does not seem to allow for the moving of multiple nodes simultaneously. Additionally, having an option to move selected objects in one go would be very helpful, allowing a user to move grou...
Guest 12 months ago in InfoWorks WS Pro / Productivity 1 Gathering support

Give a warning when copying between networks with different user defined defaults

when copying for example conduits between networks with flags #D for headloss and roughness, the values are adapted to the user defined values in the new network. This can be confusing.
Guest about 3 years ago in InfoWorks ICM / Flags / Import data / Productivity 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest about 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Bank line ground model update from within properties view

Make update from ground model possible from within properties view (as is already possible for cross sections)
Guest about 3 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Add a function: Dividing Polygon Objects in ICM

After creating a subcatchment polygon, there is a case where the polygon needs to be divided due to reasons such as creating a new road. In InfoWorks CS, there was a tool to divide polygons with line data, but it disappeared in ICM. Without the to...
Nami Ikarashi over 1 year ago in InfoWorks ICM 4 Already exists

Adding Copy&Paste functionalities to the ICM UPM tool outputs

We would like to be able to easily copy paste the summarised results given by the UPM tool. We currently have to manually copy these results into excel which is prone to human error.
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis.

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis. This includes: Removing the dependency of exceedances in a river on spill duration. This would provide a more robust app...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support