Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks WS Pro

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest over 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 6 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Demand Area Analysis for partially metered areas

Demand Area Analysis was originally intended for networks where the unprofiled demand was unmetered. When domestic (unprofiled) metering became more prevalent Innovyze introduced “Current Average Specific Consumption (l/p/day)” in the calculation ...
Guest about 2 years ago in InfoWorks WS Pro / Productivity 2 For Review

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 2 years ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Making a run in WS/WSpro now a (big) list of yellow warnings pop up. By using an optional selection of (run)validation items not anymore

Making a run in WS/WSpro the input always gets fully validated including items not used. Those items creates a (big) list (e.g. 81.273) of yellow warnings. Besides run/validation time causes this a list of not wanted necessary warnings which makes...
Jeroen Fietje about 5 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi over 2 years ago in InfoWorks WS Pro / Other 0 For Review

As a user it is good to allow tab windows to take it out to the second or third display

Tab windows are not allowed to move main window to second display.
Guest almost 6 years ago in InfoWorks WS Pro 0 Will not implement

Enable re-runs for selected scenarios

With the new Reserved Run workflow I can re-run simulations with my latest changes quickly without needing to commit. However if I'm using scenarios in the run, WS Pro re-runs all scenarios every time, even if there weren't any changes. I want an ...
Nathan Gerdts about 3 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

More user friendly management on toolbars

The standard position of the toolbars is all on top of each other. If you want to move a toolbar from its standard position, the compact toolbars turn into floating windows. Returning the toolbar back to its compact shape will also return the tool...
Hidde Galema about 3 years ago in InfoWorks WS Pro / Persona 2 Gathering support