Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 380 of 1442

Retain company logo in Hard Copy Headings

Company logo/attached image currently disappears from Hard Copy Headings after closing and reopening InfoDrainage. Other headings are retained. The image should also be retained when the file is reopened.
Daniel'le DeVoss almost 2 years ago in InfoDrainage / Reporting 2 Gathering support

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner about 2 years ago in InfoDrainage / Hydrology 2 Already exists

Include parts mapping files for the UKIE country kit by default.

Across the UKIE region many designers will use the UKIE country kit for building Civil3D models, instead of everyone making their own parts map files this could be an integral part of the data exchange between two Autodesk products, included in th...
Guest about 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

Expand Primary Key Fields to Support UUIDs

It would be helpful to use UUIDs as primary/secondary key fields for row objects for data exchange with other GIS databases. It could also be a better way of generating new IDs than the default approach of sequential numbers, which cause problems ...
Dave Watts 10 months ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Cumulative Inflow Areas Against Junctions and Connections Results

In order to aid the quality assurance process that exists throughout drainage design, it would make life much simpler to have a cumulative contributing inflow area against junction summaries. Being able to sense check results with the contributing...
Guest 10 months ago in InfoDrainage / Reporting 2 Gathering support

SWMM Export from InfoDrainage

Certain authorities use other SWMM-based software for review purposes or as their city-wide model that needs to be updated. We need to export a SWMM file for more universal submittal purposes, even if InfoDrainage uses a modified SWMM engine.
Midori Patterson about 2 years ago in InfoDrainage / Data Exchange 3 Under consideration

Junction Loss

There need to be more options for calculating junction loss. Having values for entry and exit loss isn't enough. Recommend HEC-22 and AASHTO at a minimum.
Guest over 1 year ago in InfoDrainage / Hydraulics 2 Gathering support

Quick view graph docked in Results Properties Panel

When reviewing models, I want a quick view graph of any selected object in a docked location to review. The results Properties Panel could be a potential location. I want to be able to switch through to select which output is being displayed on th...
Nathan Gerdts 10 months ago in InfoWorks WS Pro / Productivity 0 Gathering support

Use outflow from one phase as inflow into another phase.

When working on large, multi-phase projects in InfoDrainage, it is common practice to model each development phase in different InfoDrainage phases. However, challenges arise when runoff from one phase discharges into another. Currently, users mus...
Guest about 1 year ago in InfoDrainage / Data Exchange 0 For Review

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 11 months ago in InfoDrainage / Hydrology 0 For Review