Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1370 of 1370

Easily transform node from one type to another

Self explanatory. Use a user selection or domain.
Colin Ricks 10 months ago in InfoWater Pro / Productivity 1 Under consideration

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Dave White about 6 years ago in InfoWorks ICM / Productivity 4 Gathering support

Results tables to be ordered from most upstream junction/connection to outfall

As per the title, currently the results tables are presented in numerical order - which doesn't always make sense when interpreting the results. I.e should be presented in the same order they were in Microdrainage.
Guest about 1 year ago in InfoDrainage / Reporting 0 For Review

Order Junction & Connection Results Printout by Flowpath (to match the Model Printout)

Issue: When using the 'print' feature, if a flow path is selected, the model summary for junctions will show ALL connected pipes, in 'flow' order, which is very useful for presenting/understanding data. However, in the results tab for connections,...
Alex Purcell over 1 year ago in InfoDrainage / Reporting 0 For Review

Enable 3D video in defects tab of surveys

3D video can provide additional insight for sewer inspections (manhole & CCTV). As of now, the viewer in the defects tab doesn't have the standard panning functionality necessary for viewing 3D video.
Guest 8 months ago in Other Product Ideas / Asset Management 1 For Review

Option to "remember my choice" on the Query Set Cache pop-up

The pop-up asking whether to use the cache or re-run Query Sets every time you switch scenarios can get annoying. It would be nice to have a checkbox that says "always re-run queries" or something to that effect so that this pop-up can be suppressed.
Grant Clemens about 2 months ago in InfoWater Pro / Productivity 0 For Review

Provide Velocity Constraint in Multi-Fireflow

Provide the ability to limit velocity for the multi-fireflow run option. Presently only the Fireflow run option offers a max velocity constraint capability; the Multi-Fireflow run option does not have a max velocity feature.
Guest 11 months ago in InfoWater Pro / Engine 0 Under consideration

Moving multiple nodes and links simultaneously

The “Move Nodes” option under GeoPlan > Geo Plan tools does not seem to allow for the moving of multiple nodes simultaneously. Additionally, having an option to move selected objects in one go would be very helpful, allowing a user to move grou...
Guest 8 months ago in InfoWorks WS Pro / Productivity 1 Gathering support

InfoSurge constant reporting interval

Often, different InfoSurge runs report results at different intervals, even though the simulation duration is the same. This makes it difficult to do comparisons of results. Please allow the user to set a report timestep like you can with a standa...
Colin Ricks 3 months ago in InfoWater Pro / Productivity 0 For Review

Create an RTC field within object properties in ICM

Currently in order to establish where & how RTC's are influencing a network, you are required to open the RTC editor window / expand each individual RTC to see all the details & cross reference any object ID's to see if it may be affecting...
Shaun Vial over 2 years ago in InfoWorks ICM / RTC 1 Gathering support