Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 656 of 1375

ICM Status bar to show more significant figures

The status bar currently only displays levels (ground model level, water depth) to 1 decimal place. 2 Decimal places would be much more useful, Especially to ensure a node is at a low point or in the gutter invert..
Gregory Smith almost 5 years ago in InfoWorks ICM / Productivity / Visualization 1 Gathering support

Compare WWG and TWG files

A tool to compare different WWG files and TWG files and report on the differences, similar to the Compare functionality for Networks.
Guest almost 3 years ago in InfoWorks ICM / Import data 1 Gathering support

As a user, I would like to predict the number of future failures using the regression analysis because it helps with establishing a replacem

The LEYP regression analysis is the most advanced deterioration model in the suite. I would like to use this model to predict the number of future failures given an input time period or the time period until the next break. Currently the LEYP mode...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Dissolve river reaches into multiple river reaches

It would be great to have the capability to generate automatically and perfectly snapped nodes in all/some of the X-sections of one/multiple river reaches in ICM and therefore split that river reach into various river reaches (kind of the opposite...
Guest almost 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Implement the Inflow Time Series Scaling Factor in InfoWorks from ICM SWMM

Scale Factor In ICM SWMM or SWMM5 a multiplier is used to adjust the values of the constituent's inflow time series. The scale factor can have several uses, such as allowing one to easily change the magnitude of an inflow hydrograph while keeping ...
Robert Dickinson almost 2 years ago in InfoWorks ICM / Flow 0 Gathering support

Simple means to set initial storage area water surface elevations

Please incorporate a system for setting initial water surface elevations in storage nodes that works as easily as the process is in XPSWMM or HEC-RAS. The program should hold this water level during warm-up stabilization.
Guest almost 6 years ago in InfoWorks ICM / Hydraulics / Simulations 0 Gathering support

XPSWMM Inlet capacity - head difference rating or geometry-based inlets

Inlet capacity creates a second node internally to XPSWMM. Currently, the rating curve methods for it are calculated based on node depth, rather than head differential, which doesn’t work right with 2D if the storm sewer HGL is above the gutter. ...
Guest almost 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

User URL for X/Y Coordinates

Currently, the User URL option for the "View Online" menu in Innovyze ICM only allows for the output of longitude and latitude coordinates. Our GIS system is built on the BNG projection and therefore uses X/Y coordinates in its URL. Can you enable...
Benjamin Mauck almost 5 years ago in InfoWorks ICM / API / Exchange 0 Gathering support

Add calibration criteria

Add in ability to review calibration in the model using calibration criteria such as those contained in the CIWEM COP
Guest about 3 years ago in InfoWorks ICM / Calibration 0 Gathering support

Remove character limit in stats template

Currently runs can have unlimited-length names. However, when running the stats template, they can only have 100 characters. This causes productivity issues having to rename them. Character limit lengths should be consistent across all use cases
Guest about 2 years ago in InfoWorks ICM / Productivity 0 Gathering support