Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 248 of 1370

Insert contours at regular intervals instead of "double pegs"

Currently, contours can be added at irregular intervals by using the "double pegs" function in InfoDrainage. In reality, contours are always placed at regular intervals, such as a major contour at every 10 ft or 5 ft of elevation. The option to ad...
Daniel'le DeVoss over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Lock pipe diameters only.

After simulation and there is flooding, trying to upsize the pipes, if the wizard is run again it reverts to the previous diameter, i dont want to lock (ALL) as i still want to use the wizard to lower the inverts etc, downstream.
Steven Gilchrist over 1 year ago in InfoDrainage / Hydraulics 3 Gathering support

RTC - New time range to allow "between 2 dates" every year

In a similar way to the way "time repeat" works, can we have an RTC range that works between the same 2 dates every year. I have a catchment where the operating protocol works differently in the Bathing Season from the rest of the year. Having a w...
John Sourbutts about 6 years ago in InfoWorks ICM / RTC 0 Gathering support

Apply RTC / observed values to Sluice Linear Structures

At the moment we cannot move sluice linear structures in 2D. We're wanting to model a river entirely in 2D but the river is subject to a series of barrages that would require control. Therefore it would be essential to apply RTC and observed setti...
Richard Body over 5 years ago in InfoWorks ICM / River Modeling / RTC 0 Gathering support

Allow changing displayed simple junction size

In plan view we are able to change the sizes of icons, labels, proper manholes and many other parts of our pipe networks, but the symbology for simple junctions is fixed in size (at about 1.2m?) and cannot be changed, which makes modelling, for ex...
Guest 11 months ago in InfoDrainage / Productivity 0 For Review

Adding Sediment Basin Design Function

It would be helpful if we can design sediment basins in infodrainage as another stormwater control and phase
Jenna Woyner almost 2 years ago in InfoDrainage / Other 2 Will not implement

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc
Guest about 2 years ago in InfoDrainage / Reporting 3 Gathering support

Hybrid gravel and crate soakaway option

We would like a Stormwater control (soakaway) feature that allows for a narrow gravel trench below a crate layer within the same soakaway, we have tried modelling as two separate features but the interaction between the two systems isn't accurate ...
Mark Jennings 5 months ago in InfoDrainage / Hydraulics 0 For Review

Add a Brownfield Runoff tool under Preliminary Sizing > Calculators in the ribbon

To assist with initial site assessment, a brownfield runoff tool with printable reporting for the chosen rainfall events would be useful in the Preliminary sizing ribbon to allow analysis of brownfield and greenfield runoff rates from the same loc...
Guest almost 2 years ago in InfoDrainage / Hydrology 2 Already exists

Different shape sluice or pipe/orifice closure option

We usually model closed gates as sluices, as they are the ones that can easily be closed (by setting the height to zero). The downside of this is that it can only be a rectangle (and it usually closes off a round pipe). An orifice now has the nice...
Marcel Glasbergen over 2 years ago in InfoWorks ICM / Orifice / RTC 0 Gathering support