Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 170 of 1370

New docked quick graph view of selected object

When reviewing the model, I want an active graph panel I can dock anywhere that always shows me the selected object. Each time I select a new object, update the graph with the default output type. If possible, include option to select multiple obj...
Nathan Gerdts 6 months ago in InfoWater Pro / Productivity 0 Gathering support

Export and label nodes/pipes by their ID within generated HGL Profiles

Currently you are able to generate HGL profiles within the Report Manager. The data can only be labelled by their "head" value or by custom labels, however there is no option to label by their ID and to manually input every node turns into a heada...
Guest over 1 year ago in InfoWater Pro / Automation 2 Gathering support

Easily transform node from one type to another

Self explanatory. Use a user selection or domain.
Colin Ricks 10 months ago in InfoWater Pro / Productivity 1 Under consideration

Option to "remember my choice" on the Query Set Cache pop-up

The pop-up asking whether to use the cache or re-run Query Sets every time you switch scenarios can get annoying. It would be nice to have a checkbox that says "always re-run queries" or something to that effect so that this pop-up can be suppressed.
Grant Clemens about 2 months ago in InfoWater Pro / Productivity 0 For Review

Provide Velocity Constraint in Multi-Fireflow

Provide the ability to limit velocity for the multi-fireflow run option. Presently only the Fireflow run option offers a max velocity constraint capability; the Multi-Fireflow run option does not have a max velocity feature.
Guest 11 months ago in InfoWater Pro / Engine 0 Under consideration

InfoSurge constant reporting interval

Often, different InfoSurge runs report results at different intervals, even though the simulation duration is the same. This makes it difficult to do comparisons of results. Please allow the user to set a report timestep like you can with a standa...
Colin Ricks 3 months ago in InfoWater Pro / Productivity 0 For Review

Display critical results for indvidual elements

With the variability of design rainfall patterns, critical hydraulic results (mean/median/min/max) often occur at different rainfall durations for different elements (eg specific pipe/MH/channel/etc) within a network for the same rainfall event pr...
matthew.piggott about 1 year ago in InfoWorks ICM / Results 2 Already exists

Improve database and results files read performance

When opening an ICM network for the first time (i.e. no network files in the local files "Working" folder), the WDS reads through the database file in 4 kB chunks to retrieve the requested version of the network. This read process appears to be li...
Peter Dunlop almost 4 years ago in InfoWorks ICM / Performance / Results 3 Gathering support

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support