Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Simulations

Statistic Report Enhancement

Provide a way to enhance the statistical report to allow specific criteria above a threshold.
Guest almost 7 years ago in InfoWorks ICM / Reporting / Statistics 0 Gathering support

Graph sum of multiple objects instead of each selected object

While looking at multiple drainage areas in a basin (in my example), results can become hard to read; it would be nice if you could graph multiple objects and have the option to see the summation of the selection instead of each individual item.
Andrew (AJ) Czubai over 3 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Export both the result and the underlying property fields

When the model results are displayed on the webpage through Exchange, since the basic properties need to be viewed, the corresponding basic properties of the results need to be exported first, and then the results are matched to the basic properti...
Liu Qiusheng over 5 years ago in InfoWorks ICM / Export Data / Simulations 0 Gathering support

Report showing history of simulation jobs running on server over a period of time

We are aware that ICM simulation jobs that are currently running on a simulation server can be viewed in the agent.state file in D:\Innovyze\InfoWorksAgent on the server. It would be great if there were a report that could show the history of ...
Mark Huxtable about 2 years ago in InfoWorks ICM / Statistics 0 Gathering support

Document how results pfc vs r.pfc are calculated for open channels

in the long plots we ask for two capacities, we get pfc vs r.pfc for pipes they are the same , but for open channels such a trapezoidal they are different. there seems to be no literature on this.
John Krpan over 2 years ago in InfoWorks ICM / Results 3 Will not implement

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward over 2 years ago in InfoWorks ICM / Results 2 Already exists

Restrict use of a simulation server to specific users - to give priority to certain workflows

In a workgroup setting with ICM with several simulation servers it is possible to limit a named group of simulation servers (a "group" can be just one server) for use with specific ICM model databases. We would like to be able to limit use of a s...
andy.bolden over 5 years ago in InfoWorks ICM / Simulations 0 Gathering support

Enable alternate versions of the SWMM engine within ICM

I would like to have the option to use a different version of the SWMM engine to be run instead of the latest Innovyze version. In some cases this is required, but it is often very helpful to confirm the results from previous versions.
Guest over 5 years ago in InfoWorks ICM / Simulations / SWMM 2 Gathering support

Convergence Errors be resolved automatically while the model is simulated

Sometime a TSR running for few weeks throws up convergence hence these sims need to be rerun with shorter timestep which is both inefficient and a lot of time is wasted. It would be good if somehow the simulations dialog allowed to run the model w...
Salam Jamadar over 5 years ago in InfoWorks ICM / Performance / Simulations 0 Gathering support

Flags for tracing and long section

Placing flags at any node and having a "connect" button based on network connectivity leads to a big increase in workflow productivity. Flag tracing can be very useful for long section selection, upstream tracing from pump stations, and long secti...
Casey Shannon almost 3 years ago in InfoWorks ICM / Results 1 Gathering support