Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 320 of 1373

Order ARR19 Box and Whisker plots by duration

The box and whisker plot outputs order alphabetically. It would be useful if it ordered based on rainfall event duration instead.
Guest almost 3 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Background tasks overall progress visible in ICM

I think waiting for ICM to finish the task without having an idea about when this might be is not productive at all. Tasks like opening a simulation, graph something in the model, running a statistical template should be done accompanied by a load...
Ionut Pintea almost 6 years ago in InfoWorks ICM / Performance 1 Gathering support

Add Snowmelt to InfoDrainage

The addition of SWMM5 snowmelt will make it easier to model LID's in North America which has a lot of snowfall in Canada and the northern USA. Snowmelt can be a significant source of water annually to a LID or SuDS.
ROBERT DICKENSON over 2 years ago in InfoDrainage / Hydrology 1 Under consideration

Realistic Flow in SuDS structures

Realistic flow through bioretention, permeable paving and other SuDS within hydraulic models.
Guest about 3 years ago in InfoDrainage 0 Gathering support

Exceedance Level in Infodrainage

It would be good to have an option in underground stormwater controls to have a separate option for exceedance level and Ground Level By taking the exceedance level as GL, it makes the Long sections look distorted when in reality it is common for...
Guest about 3 years ago in InfoDrainage 1 Already exists

InfoDrainage - Permeable Paving

It would be useful to have a central granular conveyance trench beneath permeable paving to avoid the need for overly deep sub base beneath the road / drive.
Guest about 3 years ago in InfoDrainage 1 Already exists

Import EPASWMM5 Files

Importing EPASWMM5 files for US users would help to streamline the transition from SSA (you can export to SWMM5 from SSA)
Guest about 3 years ago in InfoDrainage 2 Under consideration

InfoDrainage - Split subcatchments option for Laurenson runoff routing method

It is industry best practice to split up the subcatchments in a model into their pervious and impervious areas when adopting the Laurenson (or RAFTS) runoff routing method ie U = 2 and U = 0. The current workflow to achieve this is to setup the mo...
Guest about 3 years ago in InfoDrainage 1 Under consideration

Different Timesteps for Run-Off only for Episode Collection

For models that need significant run time up for antecedent conditions, or for long-term continuous rainfall simulations where we just need specific events for the network results, we have found the episode collection with run-off only between eve...
Niall Bassett about 2 years ago in InfoWorks ICM / Simulations 0 Gathering support

Rename Pages in Observed vs Predicted Graphs to Flow Monitor/ Depth Monitor nos

Provide way to rename Pages on Observed vs Predicted Graphs to Flow Monitor/ Depth Monitor nos. If there are considerable nos of FM/ DMs, an individual has to go through page nos to find out which FM is checked/verified. Facility to rename the pag...
Salam Jamadar over 4 years ago in InfoWorks ICM / Productivity / Results 1 Gathering support