Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 203 of 1372

I want Infoworks' "Export maxima to GIS" to include the below parameters to assist scour protection design within 2D Zone

1. For shear-stress-based design 1.1 Max Shear Stress (in N/m2 with at least 1 digit after the decimal point) 1.2 Hydraulic Slope at Max Shear Stress (in percent with at least 3 digits after the decimal point) 2. For velocity-based design 2.1. Max...
Phuong Mai over 3 years ago in InfoWorks ICM / Export Data / GIS Layers / Simulations 1 Gathering support

Implement an optimising tool back into WS Pro

Develop an optimiser tool similar to the InfoWater Designer tool for WS Pro. Optimatics Optimiser is expensive so does not allow all of the market access.
Guest about 1 year ago in InfoWorks WS Pro / Automation 0 For Review

Wet Well Graph

As a modeler, I would like to see a plot showing everything for a pump station in one place. See the attached figure. Inflow/outflow and the flows from each pump. The 3D chart helps a lot showing which line is which.
Guest over 3 years ago in InfoWorks ICM / Results 0 Gathering support

The ability to create multiple Selection Lists at once

I am currently working on a model with a large number of DMAs. This means I have to select each specific area, and save this as a selection list - so I can easily identify areas in the future. This is a very time consuming task, and the ability to...
Sam Bonnington over 2 years ago in InfoWorks WS Pro / Automation 1 Gathering support

Schedule Jobs - remove Any computer

Ability to remove 'Any Computer' option from Schedule jobs window.
Guest over 3 years ago in InfoWorks ICM / Productivity / Simulations 1 Gathering support

Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction

Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger nega...
Guest almost 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Detention Time Modelling

We would like the model to calculate detention time of sewer in a simulation. The idea is similar to water age calculation in WS. The aim is to use this as a proxy for odour study, in essence we would like to be able to create thematic maps to sho...
Guest about 5 years ago in InfoWorks ICM / Reporting / Results / Wastewater 0 Gathering support

Open/Closed Valve Control - Live Data

When using an open/closed valve, setting a time profile to describe the opening and closing pressures, it would be useful to be able to load values form Live Data. It should be possible to connect the valve to 2 different live datas: one live data...
Paolo Boiardi over 1 year ago in InfoWorks WS Pro / Engine 0 For Review

In some types of elements the result of the simulation between consecutive time step are very different (oscillations).

Simulation results very differents between consecutive calculation times in series or cascade regulation elements; such as, pressure regulating valves (PRV), float valves (FLV), pumps, ...
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Engine 2 Already exists

Insufficient channel modeling

Impossibility of simulating the operation of a "real" channel with different sections created by different cameras: derivation, shipones, ...
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Engine 0 In progress