Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 203 of 1372

"Schedule Job(s)" request for extra functionality

At present, when two users each send a large batch of simulations to run on a remote PC via the coordinator, the coordinator is not very smart about allocating out resource to the simulations. For an extreme example, let’s say there is a remote...
Jason Kulsdom about 2 years ago in InfoWorks ICM / Simulations 0 Gathering support

Sort selection sets/ re-order them

Would be very useful if you could either sort selection set orders or move selections up or down the list. This would make it much faster to find the selection set you want in a large list (e.g. DMA selection sets in alphabetical order)
Duncan Allen over 5 years ago in InfoWorks WS Pro 1 Gathering support

I want combine Critical Link Analysis with multiple scenarios

Today I can only select 1 scenario when running a critical link analysis run (or maybe general multi runs). I want to be able tot select multiple. This way, if I have 5 scenarios, I do not have to create 5 separate runs to check criticality of all...
Caroline Heylen about 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Copy all the scenarios from a Model

I would like to make a subsystem copy of a model (with different scenarios) that brings all the scenarios to the new model when I make a copy of the selected nodes and links. At this moment, a copy only brings the current scenario. Thanks
Juan Carlos Ortega about 3 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Structure flow mode reported in the results

Sometimes when evaluating results at structures we see strange results that require investigation; invariably we find out that this is because the flow mode has changed. (e.g. from free to drowned). It would be very helpful if the ICM results were...
Richard Body over 5 years ago in InfoWorks ICM / Grids / Reporting / Results 0 Gathering support

ICM - Statistics Template: Daily events

I want to be able to break my events into daily values. Currently this would require setting up 7 separate templates each with the unique day set under the 'Time Window' button. I want a tick option added that will allow me to do this within the s...
Guest over 4 years ago in InfoWorks ICM / Reporting / Results 1 Gathering support

Field construction year reference for simulation run.

The field construction year of each object type from WS Pro are not linked to the simulation runtime, so you can get information for future infrastructures that you need to move away from your model or transfer to a new model or scenario. It wo...
Guest about 2 years ago in InfoWorks WS Pro / Engine 1 Gathering support

Copy/Paste Run Setup messages

Currently you cannot copy/paste setup error/warning messages from the Schedule Hydraulic Run Window in order to further investigate. This feature would be particularly useful for troubleshooting more complex runs ie TS.
Guest about 1 year ago in InfoWorks WS Pro / Productivity 0 For Review

Sensor Objects for maps and comparisons

I want to see and interact with my sensors on the map. These could be generated from existing Live Data Points on model objects, and/or imported from GIS and joined spatially to model objects. Sim results could store the sensor data for the Run pe...
Nathan Gerdts about 1 year ago in InfoWorks WS Pro / Telemetry 0 For Review

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest almost 6 years ago in InfoWorks WS Pro 0 Gathering support