Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 299 of 1442

“Snap Lateral Nodes to Pipes” function within the Ruby interface.

include the function for “Snap Lateral Nodes to Pipes” within the Ruby interface so scripts can be used to automatically fix connectivity issues within imported corporate datasets.
Richard Robinson 6 months ago in Other Product Ideas / Asset Management 0 For Review

easier import/update for demand diagram and demand scaling

I want to be able to import demand categories from csv. The format the ddg-file has to be in to be able to import it is very complex. Creating or updating Demand Diagrams can take up a lot of time
Caroline Heylen about 1 month ago in InfoWorks WS Pro / Productivity 1 For Review

result grid for customer points

Currently results for customer point minimum and maximum pressures can be retrieved using various steps.
Guest about 1 month ago in InfoWorks WS Pro / Automation 0 For Review

Reminder and notification functionality to alert when follow up on specific reports is required.

Would it be possible to add in functionality so that users can set reminder dates against reports. This would be used to set alerts and flag to the user that further action is required on the designated date against that report.
Lianne Rose about 1 month ago in Other Product Ideas / Asset Management 0 For Review

Tank outlet pipe invert

Tanks outlet is usually above tank bottom level. It would be better to allow us to model tank outlet elevation relative to tank bottom elevation. This will increase accuracy in simulation, especially when we have multiple tanks in a tank farm and ...
Mohammed Abdallah 2 months ago in InfoWorks WS Pro / Modeler 0 For Review

To be removed

To be removed
Oscar Holemans 22 days ago in InfoWorks ICM / API / Exchange 0 For Review

Update or add object to selection list

It would be useful to have the ability to edit an existing selection list by adding or removing objects without needing to recreate the list from scratch.
Valentina Velez Rivera 24 days ago in InfoWorks WS Pro / Productivity 1 For Review

2D meshing using Ruby and ICM Exchange

As part of DWMP we are likely to need to create multiple scenarios for each network based on Growth (2035, 2045 etc...). One of the approaches ot the detriment anaylsis will require a 2D approach. Would it be possible to allow meshing from within ...
Jose Pereira over 1 year ago in InfoWorks ICM / API / Exchange 2 Under consideration

Connect storage nodes to 2D mesh

Storage nodes allow for a better schematization of large, variable size structures such as pump stations or weirs. They are missing the functionality to connect them to the 2D mesh, so flooding from those locations is not visible. Adding the optio...
Marcel Glasbergen over 1 year ago in InfoWorks ICM / Ponds/Storage 1 Gathering support

Sub‑Minute Timesteps or Enhanced Transient Controls in InfoWorks WS Pro

The minimum 1‑minute hydraulic timestep in InfoWorks WS Pro prevents realistic modelling of fast‑acting control valves that respond within seconds. This leads to overstated burst volumes and flooding impacts. Workaround: Users currently scale syst...
Daniel Alexander 30 days ago in InfoWorks WS Pro / Engine 0 For Review