Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1402 of 1402

Table Lookup Function with Interpolation - Namely for Pump Curves

As a user I want to upload my pump curves (ideally from existing model) to Info360.Later I want to use them as a lookup table for comparing the flowrate I'm observing against the manufacturer's theoretical flow rate under the given head conditions...
Nathan Gerdts almost 5 years ago in Info360 Insight 0 Under consideration

Cluster High Risk Areas

Our risk analysis and project prioritization tools are great, but project prioritization won't be in Info360 immediately and may need some tweaking anyways. The attached paper summarizes the benefits Xylem saw in clustering high risk pipes. This c...
Tim Medearis almost 5 years ago in Info360 Asset / Customization / Styling / Map tools 0 Under consideration

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Show data errors

Mike + added a function called "show data errors" in its new product in 2021, which can display objects that lack necessary field information and generate a table. This function can improve the ability of model engineers to deal with model errors ...
Liu Qiusheng almost 5 years ago in InfoWorks ICM / Validation 1 Gathering support

Scenario assigned 'official' ID numbers within software

I would like for scenario names to be prefixed with a built-in ID number, in the same way that model commits have official version numbers, and wastewater and trade waste profiles have ID numbers. ICM clearly tracks ID numbers behind the scenes, s...
Jason Kulsdom over 3 years ago in InfoWorks ICM / Scenario 1 Gathering support

Ability to resize node layers in the map.

This is a spatial symbology enhancement to what has already been implemented. Alter the node size in the theme tool
Guest over 3 years ago in Info360 Asset / Customization / Styling / Layer Panel 0 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Dashboard Not for Just Asset Module, but for part of Info360.com so KPI across multiple modules can be seen in one place.

It seems like each module is developing their own dashboard. This to me is an issue, as it violates the very definition of an integrated system and a Dashboard. People only want one Dashboard to look at. The Dashboard should be a feature in the In...
Guest about 5 years ago in Info360 Insight 0 Already exists

Dashboard Not for Just Asset Module, but for part of Info360.com so KPI across multiple modules can be seen in one place.

It seems like each module is developing their own dashboard. This to me is an issue, as it violates the very definition of an integrated system and a Dashboard. People only want one Dashboard to look at. The Dashboard should be a feature in the In...
Guest about 5 years ago in Info360 Asset 0 Will not implement