Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 254

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liqu...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Importing PFDs as Images for P&ID visualization

A paramount feature of this tool lies in its capability to incorporate P&IDs or PFDs in PDF format. Presently, there exists a limitation wherein P&IDs or PFDs cannot be uploaded as PDFs. The ability to upload PDFs would be transformative, ...
Javier Coronado 12 months ago in Info360 Insight / Images 1 For Review

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Extra Results Outputs for some features in ICM

Hi there - Doing some work for a client I found the following limitations in results exports from Infoworks ICM: 2D Base Linear Structure: ls_underflow and ls_overflow results variables cannot have a summary of peak value exported by CSV or SHP. T...
Guest 10 months ago in InfoWorks ICM / Results 0 For Review

InfoAsset Mobile - User defined object memo type

Allow users to create user defined objects against the memo type so that multi line text isn't changed to string and the formatting lost.
Lianne Rose 5 months ago in Other Product Ideas / Other 0 For Review

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi 10 months ago in InfoWorks ICM / Validation 0 For Review

Displaying GIS layers above network objects

In ICM, files added through the GIS layer control dialog are displayed below the objects. Could you add a feature to display them above the objects? For example, when representing roads with shp files, displaying these backgrounds above the object...
Nami Ikarashi 10 months ago in InfoWorks ICM / GIS Layers 1 For Review

Calculating and adding the Froude number to storm table output

Many municipalities and utilities want to maintain subcritical flow in the storm sewer system and avoid hydraulic jumps. The Froude number is used to establish subcritical vs. supercritical flow.
Guest over 1 year ago in InfoDrainage / Reporting 2 For Review

To use the results from one rehab tree as a query in another rehab tree

There is a need to be able to query if a pipe has been flagged for a rehab action in one rehab tree so it can be excluded in a second rehab tree
Michelle Mcmillan 3 months ago in Info360 Asset 0 For Review

Export functionality for SWMM objects in database tree

Be able to right-click on SWMM objects (SWMM time patterns, SWMM climatology, SWMM pollutograph) and export to CSV as you can with InfoWorks objects.
Guest 11 months ago in InfoWorks ICM / Export Data 1 For Review