Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Ability to access databases where Workgroup Data Server and databases don't reside on same server

With the large amounts of data generated it would be beneficial if a supported configuration would be to have a WDS installed on a server but pointing at databases (and solves etc) over the network on a remote storage system (such as NAS). This wo...
Guest over 5 years ago in InfoWorks ICM / Workgroup 0 Gathering support

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

Options to export the statistics block of Graph template/Custom Graph

At the moment, from many cases one can export whole time series of flow/depth etc... then have to calculate the cumulative volume or max flow...despite that statistics are visible in the graph. Allow an option to export the statistics alongside ti...
Guest over 2 years ago in InfoWorks ICM / Export Data 0 Gathering support

Option to lock units (XY Coordinates) by network

Maintain consistency across users and through time by locking units to networks, rather than units being set on a user by user basis. Primarily x-y coordinates units to eliminate potential conflicts of import and export and cross platform uniformity.
Guest over 2 years ago in InfoWorks ICM / Network 0 Gathering support

Improve "update from live data" performance

big models with many live data points connected to control takes a long time to update.
Pieter Piens over 3 years ago in InfoWorks WS Pro 0 Gathering support

PACP Split Survey observations enhancements

The issue is when the application is asked to split a survey and the survey is a PACP inspection, NASSCO expects a few things to be on the inspection. First, the first code on the inspection should be AMH with remarks (this could be the node that ...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.

Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (...
Andy Chan about 6 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Guest over 5 years ago in InfoWorks ICM / Performance 1 Gathering support

improve print functionality

The print functionality in ICM could be improved very much (printing to PDF files). It takes at the moment a lot of time and even then it is not possible to easily (and flexible) fit a selection to the chose page setup (size) for example. Or fit a...