Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1383 of 1383

Add a function: Dividing Polygon Objects in ICM

After creating a subcatchment polygon, there is a case where the polygon needs to be divided due to reasons such as creating a new road. In InfoWorks CS, there was a tool to divide polygons with line data, but it disappeared in ICM. Without the to...
Nami Ikarashi about 1 year ago in InfoWorks ICM 4 Already exists

Cavitation Check in Pumps & Valves

It is great that the software allows the definition of Control Valve curve to study the performance of the valve. However, it still needs to include the ability to define the cavitation curve (sigma or Xf) to check if the valve is cavitating or no...
Guest 2 months ago in InfoWorks WS Pro / Engine 0 For Review

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Be able to create selection lists using ICM Exchange from a list of Node or link IDs

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity 1 Gathering support

Increase RTC Comment Length and Configuration

Currently RTC Comments are limited to 69 characters and only appear within a single box that you need to scroll horizontally to read. Please allow comments to be much larger and have multi-line format so we can add useful comments and explanations...
Dave White about 1 year ago in InfoWorks ICM / RTC 1 Under consideration

Remember/Fix Toolbar positions

When moving window from fullscreen to half/split-screen all the toolbars are moved to fit half screen width. When returning to fullscreen the toolbars remain in their split-screen positions. This makes finding tools challenging, takes up more scre...
Matthew Paul about 1 year ago in InfoWorks ICM / Productivity 1 Under consideration

Adding Level 2 water quality capabilities to the ICM UPM tool

The current UPM tool only allows for completion of level 1 water quality impact assessments. We believe that our assessments would benefit greatly by having the additional functionality to complete level 2 water quality impact assessments. This me...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Increasing speed of UPM water quality tool

As part of SOAF, we are required to run CSO water quality analyses using 10-year simulations. Using these outputs in the UPM tool often takes a long time. Whilst the tool is running, the modeller cannot use ICM for completing other tasks. We have ...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

InfoAsset Manager - Add more reports to Ruby Exchange method

Currently Ruby supports the following generation of reports:The Reports which are supported and generated via this method are: Manhole Report - ['cams_manhole',nil] Manhole Survey Report - ['cams_manhole_survey',nil] CCTV Survey Report - ['cams_cc...
Anthony Andrews 2 months ago in Info360 Asset / Reporting 0 For Review

Graphical editing in Longsection

Being able to manually drag pipes up/down and alter their gradient in the long section graphics, was an extremely efficient workflow in Microdrainage, especially when using min. pipe design levels to dictate land-raise FGLs. Can this function be c...
Guest 10 months ago in InfoDrainage / Productivity 0 For Review