Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1403 of 1403

Enhancement of the CSV option for Live data configuration

currently it is possible to use a csv in the live data file for a single set of data, however most it would be useful if you could have a csv with date time down the side and multiple flows or pressures across the way (Header row of Date Time, Pre...
Duncan Allen over 1 year ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Add Vertex Workflow

The Edit Geometry Workflow for adding, and editting vertex is fragile. Inserting a vertex breaks the linear aspect of the 2D boundary as InfoWorks does not provide any feedback. Autodesk workflows in Civil 3D, InfraWorks, and Revit provide user fe...
Guest about 2 years ago in InfoWorks ICM / Mesh 0 Gathering support

Better Video Encoders

The AVI recorder uses a Windows 11 unknown CODEC - update the video encoder to something modern!
Guest over 1 year ago in InfoWorks ICM / Performance 1 Under consideration

roll back commit history

We can see what the commit history is, but if you made a mistake and committed it there's no way to go back without making a new branch. Would be good to be able to roll back changes to a selected point in the commit history so your mistake isn't...
Ben Davies almost 4 years ago in InfoWorks WS Pro 1 Gathering support

InfoAsset Manager - Double the quantity of user fields for all objects.

I often run out of user fields especially on pipe objects. It would be very beneficial to have extra fields available.
Jim O'Dowd over 2 years ago in Other Product Ideas / Asset Management 0 For Review

Include the volume of the downstram manhole ONLY if selected

Change behaviour of Storage Operations: Calculate total storage... function. The current behaviour is unintuitive and incorrect.
Guest over 1 year ago in InfoWorks ICM / Network 3 Under consideration

2D Result Long Profile results comparison

When doing flood study, XPSWMM had a cross-section tool that would show WSEL. While I can use US/DS profiles to compare two scenarions - I want to cut a long section along a 2D channel (and no I am not converting it to River Sections as it defeats...
Guest over 1 year ago in InfoWorks ICM / 2D Flooding 1 Gathering support

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley about 6 years ago in Other Product Ideas / Asset Management 0 Under consideration

Provide option to allow for several multipliers and use with selection sets

In addition to a global multiplier, sometimes you want to peak certain areas and selection sets with specific peaking factors. WaterCAD allows for this under their calculation options.
Michele Marston over 1 year ago in InfoWater Pro / Operational Modeling 0 Gathering support

modeling surge check valves

I’m also wondering if you all are considering adding more options on how to model check valves.
Guest over 2 years ago in InfoWater Pro / Engine 1 Gathering support