All ideas

Showing 1402 of 1402

Add US and DS HGLs for links

Currently ICM link results report the US and DS total head values. As a user, I'd like to see the HGL at the US and DS locations consistent with the node results. This would be useful on graphs and long sections.
Guest almost 3 years ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

RTC range: give the choice to include or exclude the minimum or maximum value

Make it possible to define 'greater than (GT)' or 'greater or equal (GE)' in a range in RTC.
Guest almost 3 years ago in InfoWorks ICM / RTC 0 Gathering support

RTC rules: order alphabetically

When copying rules, they appear in seemingly random order. When you have a lot of rules it can be very difficult to have an overview
Guest almost 3 years ago in InfoWorks ICM / RTC 0 Gathering support

Enable 3d view of two phases (foul and surface) simultaneously to help resolve clashes found in clash analysis.

Clash Analysis identifies pipes touching, which may be in different phases. The ability to view both phases in 3D View (as you can in Plan View) would make resolving the clashes much more efficient.
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez almost 3 years ago in Info360 Asset / Query types / Capabilities 1 Under consideration

Go To button to zoom to a certain pipe from the Connection table

In Civil 3D you can zoom to/select a pipe from the pipe table. It is very difficult to find specific pipes in InfoDrainage.
Daniel'le DeVoss 11 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest about 1 year ago in InfoWater Pro / Operational Modeling 1 Under consideration

Provide Preconfigured Rehab Decision Tree Logic for Customers to Get Started

No description provided
Mike Maylone about 3 years ago in Info360 Asset / Decision Tree Canvas 3 On roadmap

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Allow different Phases to use the same background files

When creating a new network through phasing we often wish to use the same CAD levels and background used by another network, without having to load another version of the same CAD files.
Guest over 2 years ago in InfoDrainage / Productivity 1 Will not implement