Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1402 of 1402

InfoSurge constant reporting interval

Often, different InfoSurge runs report results at different intervals, even though the simulation duration is the same. This makes it difficult to do comparisons of results. Please allow the user to set a report timestep like you can with a standa...
Colin Ricks 5 months ago in InfoWater Pro / Productivity 0 For Review

Export functionality for SWMM objects in database tree

Be able to right-click on SWMM objects (SWMM time patterns, SWMM climatology, SWMM pollutograph) and export to CSV as you can with InfoWorks objects.
Guest 11 months ago in InfoWorks ICM / Export Data 1 For Review

Adjust mesh locally without remeshing all

Adjust mesh locally without having to remesh the entire 2D zone.
Guest over 6 years ago in InfoWorks ICM / 2D Flooding / Productivity 2 Will not implement

PACP v8 Compliance for InfoAsset Manager and Info360 Asset

Version 8 was released in early 2024. It includes pressure pipe assessment codes. This grading system would be a significant improvement to the PACP7 compliance which, while still popular, is 7 years old. NASSCO has sunset version 6, and no longer...
Tim Medearis almost 2 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 2 Gathering support

Ability to update and/or overwrite a spatial layer

Currently the user needs to delete the layer and re-import a new one. There should be an 'update' uption for all spatial layers.
Martha Nunez about 2 years ago in Info360 Asset / Asset / Spatial Data Import 1 Under consideration

Expand Primary Key Fields to Support UUIDs

It would be helpful to use UUIDs as primary/secondary key fields for row objects for data exchange with other GIS databases. It could also be a better way of generating new IDs than the default approach of sequential numbers, which cause problems ...
Dave Watts 8 months ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Integrate a Template option for setting out run group in Infoworks ICM

I am working on project which includes 50 models. where we have to give runs for different return periods and durations for each model. It is a time taking process, which unnecessarily create chances of error by creating run setup every time. is i...
Mohit Gupta almost 6 years ago in InfoWorks ICM / Productivity 0 Gathering support

Cumulative Inflow Areas Against Junctions and Connections Results

In order to aid the quality assurance process that exists throughout drainage design, it would make life much simpler to have a cumulative contributing inflow area against junction summaries. Being able to sense check results with the contributing...
Guest 8 months ago in InfoDrainage / Reporting 2 Gathering support

Tree Pits

Add Tree Pits as a type of SuDS structure.
Guest over 3 years ago in InfoDrainage 2 Under consideration

I would like to be-able to reorder scenarios in the drop down in ICM

II would like to be able to change order of scenarios (after Base). So be able to move up scenarios or down scenarios in the drop down list. I often have to delete scenarios or created amended versions of copied scenarios and this often results in...
Guest almost 5 years ago in InfoWorks ICM / Scenario 2 Gathering support