Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1403 of 1403

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Calculation of Pump Power in ICM

A pump curve and energy/efficiency curve can be input into the software however there is no way to output the energy used by the pump. South Gippsland Water were keen on understanding whether ICM could do this to report their energy efficiency bas...
Ann Pugh about 5 years ago in InfoWorks ICM / Pumps 0 Gathering support

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Be able to drag the grid window off main interface to another monitor.

Drag grid window to another screen, just like an attribute table in ArcMap/ArcGIS Pro. Allowing more relaxed and open use of grids, with much less scrolling through tight windows.
Guest about 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 For Review

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest about 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Active/Inactive Network Elements

Ability to activate and inactivate model elements in InfoWorks as one can do in InfoSWMM.
Michael Wetterau over 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Add Data Sets to InfoWorks

Add Data Sets to InfoWorks as one can do in InfoSWMM. Helpful when clients want to model alternatives scenarios and make last minute changes.
Michael Wetterau over 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest over 3 years ago in InfoDrainage 0 Gathering support

Allow SOIL values < 0.15

The Rural Runoff estimate tool in MDSUDS does not allow values of SOIL below 0.15. The UKSUDS greenfield runoff tool defaults to a value of SOIL=0.1 where SoilType=1 This produces a significant difference in results. This difference results from u...
Guest over 3 years ago in InfoDrainage 0 Gathering support

Design settings which only allows backdrops in pipe diameters below 225mm diameter

No description provided
Guest over 3 years ago in InfoDrainage 0 Gathering support