Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1372 of 1372

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest almost 3 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest 12 months ago in InfoWater Pro / Operational Modeling 1 Under consideration

ARR critical storm analysis in Comparison Report

Please update the comparison report feature in InfoDrainage to allow ARR design storms - critical storm per drainage element. We currently cannot compare phases when using ARR storms.
matthew.piggott 7 months ago in InfoDrainage / Reporting 0 For Review

Add an option to 'apply rainfall' directly to river reach objects

Currently a user would need to define a subcatchment to generate runoff for a river reach. This is okay for 1D models but for 1D/2D models, especially 2d runoff models it adds some additional steps for the user. It would be nice for add a 'apply r...
Alex Grist 7 months ago in InfoWorks ICM / River Modeling 2 Under consideration

Sewer Design - Area Density Method

Area Density method is recommended to be incorporated in Infodrainage as it offers improved accuracy and aligns with Indian flow calculation standards which could enhance the reliability of the outputs. This method is described in Indian Guideline...
matthew.piggott 7 months ago in InfoDrainage / Other 1 For Review

Provide Enhanced Manhole Schedule Details

It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules. As an example including practical details around the cover – contractors want to know and see more from a MH s...
Guest about 3 years ago in InfoDrainage 1 Gathering support

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Allow export of user flags via ruby

As a WaSC we hold our models in a central model library and need to ensure our default flags are utilised, and the descriptors are not amended. we have automated the comparison as far as possible but the flags within any new Db have to be manually...
Richard Robinson 10 months ago in InfoWorks ICM / Export Data 0 For Review

'Find and Replace Flags' tool on multiple networks.

As a large organisation with multiple users of InfoWorks ICM we have a set up with one masterdatabase and everyone using groups off this in order to keep all users on the same version. The downside is, that as users import previous models more fla...
Tom Walker over 5 years ago in InfoWorks ICM / Productivity 0 Gathering support

Generate new synthetic rainfall events using ICM exchange

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Rainfall 0 Gathering support