Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Include an "excluded search nodes" warning in fireflow output table

When the design pressure exceeds the static pressure at a particular node, that node will be excluded from a design fireflow model run. The output table should include a banner at the top listing the excluded nodes, as these can make a big differe...
Guest almost 5 years ago in InfoWater Pro / Engine 0 In progress

Option to adjust the opacity/transparency of the ‘Satellite’ base layer

It is really useful to use that base layer sometimes but it also means it is difficult to see the asset/GIS layers without then changing the style of the layers. Darker colors tend to show up well on the ‘Streets’ basemap but light colors are more...
Guest about 3 years ago in Info360 Asset / Customization / Styling 1 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Table Lookup Function with Interpolation - Namely for Pump Curves

As a user I want to upload my pump curves (ideally from existing model) to Info360.Later I want to use them as a lookup table for comparing the flowrate I'm observing against the manufacturer's theoretical flow rate under the given head conditions...
Nathan Gerdts almost 5 years ago in Info360 Insight 0 Under consideration

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Cluster High Risk Areas

Our risk analysis and project prioritization tools are great, but project prioritization won't be in Info360 immediately and may need some tweaking anyways. The attached paper summarizes the benefits Xylem saw in clustering high risk pipes. This c...
Tim Medearis almost 5 years ago in Info360 Asset / Customization / Styling / Map tools 0 Under consideration

Scenario assigned 'official' ID numbers within software

I would like for scenario names to be prefixed with a built-in ID number, in the same way that model commits have official version numbers, and wastewater and trade waste profiles have ID numbers. ICM clearly tracks ID numbers behind the scenes, s...
Jason Kulsdom over 3 years ago in InfoWorks ICM / Scenario 1 Gathering support