Allow Theming Inflow areas by attributes

I would like to visually theme the Inflow areas by an attribute, say, Percent Impervious (PIMP)
Guest over 3 years ago in InfoWorks ICM / Theme / Visualization 0 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott almost 2 years ago in InfoDrainage / Rainfall 1 For Review

Option to pan through 2 or multiple geoplans at the same time

Sometimes (in ICM and IAM) in comparing 2 (or more) networks visually the networks are most of the time tiled horizontally of vertically. But when panning through one network, it would be very convenient that the other network(s) is/are also movin...
Guest over 5 years ago in InfoWorks ICM / Productivity 0 Gathering support

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing almost 2 years ago in InfoDrainage / Reporting 3 Already exists

Report InfoSWMM available capacity against theoretical flow for specified d/D

InfoSWMM provides Pipe/Conduit summary report with values for Max flow divided by "Full Flow". Here the "full flow" is based on Manning's equation for when the pipe is full. However as a sewer utility, we're not allowed to fill pipes. We must keep...
Guest over 5 years ago in InfoWorks ICM / Grids / Reporting 2 Gathering support

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest almost 2 years ago in InfoDrainage / Visualization 1 Gathering support

Better documentation on XPX/XPTABLES to map UI element to variables

I would like for Innovyze to create a complete list of all the codes that can be used in XPX or XPTables, with descriptions of how they are used, and/or make it very easy to find out what those codes are. For example, NKLASS is used in XPX to ...
Guest over 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

Restrict user ability to "Empty Recycle Bin"

Ideally it would be good to give a couple of named users the ability to empty the recycle bin - everyone else can send things TO the recycle bin, and can go into the bin to recover 'deleted' items, but they won't be able to empty it. This function...
Jason Kulsdom over 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Use of cfg for mapping in Polygon Generation via Intersection or have a Ruby do it

In doing (and often multiple redoing) the Polygon Generation via Intersection, it would be very useful to have the opportunity to save the mapping (which GIS or Network Field in which Polygon field) in a cfg file, like the ODEC feature has the opp...
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity 0 Gathering support

Report showing history of simulation jobs running on server over a period of time

We are aware that ICM simulation jobs that are currently running on a simulation server can be viewed in the agent.state file in D:\Innovyze\InfoWorksAgent on the server. It would be great if there were a report that could show the history of ...
Mark Huxtable almost 2 years ago in InfoWorks ICM / Statistics 0 Gathering support