Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 942 of 1442

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Guest over 5 years ago in InfoWorks ICM / Performance 1 Gathering support

Please provide Intellisense to the SQL Editor in ICM

I want the SQL Editor to help me write SQL queries by color coding and autocompleting data, similar to Intellisence.
Guest over 6 years ago in InfoWorks ICM / SQL 0 Gathering support

Display multiple networks in 3D.

In order to aid the layout design of drainage networks, it would be useful to see both foul and surface water sewer networks simultaneously, in the 3D view. This would allow designers to see the clearance between pipes and chambers and have piece ...
Guest about 2 years ago in InfoDrainage / Visualization 3 Already exists

Better hydraulic representation of flow in permeable paving

Flow through permeable paving does not occur as one would expect. Is greatly affected by the shape and direction the paving is drawn in InfoDrainage. When drawing an irregular shape the hydraulic grade lines appear incorrect, with flow all at one ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Options to export the statistics block of Graph template/Custom Graph

At the moment, from many cases one can export whole time series of flow/depth etc... then have to calculate the cumulative volume or max flow...despite that statistics are visible in the graph. Allow an option to export the statistics alongside ti...
Guest almost 3 years ago in InfoWorks ICM / Export Data 0 Gathering support

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest almost 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Option to lock units (XY Coordinates) by network

Maintain consistency across users and through time by locking units to networks, rather than units being set on a user by user basis. Primarily x-y coordinates units to eliminate potential conflicts of import and export and cross platform uniformity.
Guest almost 3 years ago in InfoWorks ICM / Network 0 Gathering support

WBNM Hydrology Method in ICM

Australian flood modelling user have requested access to the WBNM hydrology method inside InfoWorks ICM. WBNM is one of the endorsed methods in Australian Rainfall & Runoff and large numbers of historical studies use this method.
Guest almost 6 years ago in InfoWorks ICM / Rainfall 0 Gathering support

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest over 1 year ago in InfoDrainage / Productivity 1 Gathering support

improve print functionality

The print functionality in ICM could be improved very much (printing to PDF files). It takes at the moment a lot of time and even then it is not possible to easily (and flexible) fit a selection to the chose page setup (size) for example. Or fit a...
Richard Wilbrink almost 3 years ago in InfoWorks ICM / Printing 1 Gathering support