Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 135 of 1370

Add an option to automatically Refresh All graphs in the Report Manager after a new run.

Currently when you complete a new run you have to remember to hit Refresh All in the Report Manager to see latest results. The use-case for viewing old run results is rare, so having an option to automatically refresh all graphs and tables would b...
Grant Clemens over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Make Scenario Explorer window panes resizable to see long Data Set names

When you resize the Scenario Explorer window, the left side with the Scenarios gets larger but the right side with Data Set / Facility / General tabs does not widen, so you can't see long Data Set names without opening a separate window.
Grant Clemens about 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Hydrant Available vs. Hydrant Design

Has anyone had issues with the hydrant available flow being less than the hydrant design flow? It has always been my impression that the hydrant available flow has less constraints and therefore would have a higher fire flow than that of the hydra...
Guest about 1 year ago in InfoWater Pro / Automation 1 For Review

Delete Vertex in Pipe

I would like to be able to remove vertices from a pipe. Currently, you can only move the vertices or redraw the pipe. This process takes a while on big models and makes the distribution network more complicated.
Guest 6 months ago in InfoWater Pro / Other 0 For Review

Cross Section view of channels/weirs

Some hydraulic analysis reports require a cross section view of HGLs/EGLs of weirs, channels, or ponds. See attached image.
Tim Medearis 9 months ago in InfoDrainage / Visualization 0 For Review

Display Inflow catchment areas to 3 decimal places in plan view

Displaying network information in plan view, which is displayed when exported to CAD is great, however the decimal rounding is only to 2 decimal places. It would be good for the display to be rounded to 3 decimal places so it can be easily correla...
Guest 6 months ago in InfoDrainage / Visualization 0 Gathering support

Automate the "geodatabase rebuild" troubleshooting process

When models start to behave erratically or sluggish, a common recommendation is to "rebuild the model geodatabase" as shown here: https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/Troubelshoot-Map-Issues.html It wou...
Grant Clemens over 1 year ago in InfoWater Pro / Automation 0 Gathering support

Could we add a preference to disable the popup to accept the most recent run data?

The popup is confusing, and we don't see a point in not accepting the latest run results.
Deb Smith 10 months ago in InfoWater Pro / Productivity 2 Gathering support

CAD Data Layer Controls

When you have your CAD files in the drawing, you can control what layers show up. However, you can only select one at a time, you can't sort, and often your selections will reset. This would improve the plan view controls quite a bit.
Jess Ewing over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 1 year ago in InfoWater Pro / Other / Productivity 0 Gathering support