Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 264 of 1370

Labeling manhole and pipe IDs in the Map

It makes it easier to QAQC data, or simply determine which asset it being viewed in the Map.
Martha Nunez about 2 years ago in Info360 Asset / Data Management 3 On roadmap

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Pipe names missing in export from Civil3D

When exporting pipes from Civil3D to Infodrainage, the pipe names keep reverting to the autogenerated names given when pipe is created in Civil3D even though they were renamed in Civil3D.
Jenna Woyner almost 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

Go To button to zoom to a certain pipe from the Connection table

In Civil 3D you can zoom to/select a pipe from the pipe table. It is very difficult to find specific pipes in InfoDrainage.
Daniel'le DeVoss 9 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Level Soffits in pipe network.

Although you can select Level Soffits in the Network Wizard, if you make a change in the manhole depth for example, the pipes in the network will return to invert level, which means that you will have to readjust them manually.
Konstantinos Koutroulis almost 2 years ago in InfoDrainage / Hydraulics 1 In progress

Allow all uploaded fields as accessible for risk analysis

The risk analysis by attribute can only support a limited number of pre-configured fields. Users might have additional fields they want to include in their risk analysis (see example of IAP risk compared to Info360 Asset dropdown). Right now, this...
Tim Medearis over 1 year ago in Info360 Asset / Data Editing 1 In progress

Calculating and adding the Froude number to storm table output

Many municipalities and utilities want to maintain subcritical flow in the storm sewer system and avoid hydraulic jumps. The Froude number is used to establish subcritical vs. supercritical flow.
Guest about 1 year ago in InfoDrainage / Reporting 2 For Review

Allow two Infodrainage files to be combined

Request for a paste, copy, cut branch to file options, to allow two Infodrainage files to be combined. As the available in Microdrainage
Guest over 1 year ago in InfoDrainage / Other 2 Under consideration

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review