Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 32 of 1370

Apply RTC / observed values to Sluice Linear Structures

At the moment we cannot move sluice linear structures in 2D. We're wanting to model a river entirely in 2D but the river is subject to a series of barrages that would require control. Therefore it would be essential to apply RTC and observed setti...
Richard Body over 5 years ago in InfoWorks ICM / River Modeling / RTC 0 Gathering support

Bank marker distinctions

It would be good if cross sections for rivers could be marked with left and right bank markers within the cross sections themselves.
Guest almost 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support

River reach theming

It would be great if a river reach could be themed individually across the left and right banks and if theming were more flexible for storage areas too.
Guest almost 6 years ago in InfoWorks ICM / River Modeling / Visualization 0 Gathering support

Display linked live data in long section view

When calibrating a model with multiple pressure loggers, it would be useful to see reference HGL's in the Long Section view at any points with live data. This could be represented as floating points based on the current timestep. This helps unders...
Nathan Gerdts over 2 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Multiple river section results

It would be great if multiple river sections could be selected and if it was then possible to produce multiple object graphs from these and by extension do exports.
Guest almost 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Assign Channel shape from ground model using cross section

In ICM I can sample elevations from ground model to cross section line and use that for river reaches, but sometimes I just want to use simple Channel links or maybe I'm using the SWMM engine which doesn't have rivers. I want to pull the channel ...
Guest almost 5 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support

Enhancement of the CSV option for Live data configuration

currently it is possible to use a csv in the live data file for a single set of data, however most it would be useful if you could have a csv with date time down the side and multiple flows or pressures across the way (Header row of Date Time, Pre...
Duncan Allen over 1 year ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Smart meters

Water utilities in Australia are installing smart meters in domestic and other non residential properties. Smart meters generates large data sets at each and every individual properties. Any thoughts to integrate those data in to the distribution ...
Guest almost 6 years ago in InfoWorks WS Pro / Data Exchange / Telemetry 2 Under consideration

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest over 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Validation of Bridge data

When a model is validated, it doesn't pick up on problems with bridges, that prevent the model from running. For example, the error "bed section is above soffit" is given when trying to run the model, but does not appear in the validation messages...
Guest almost 5 years ago in InfoWorks ICM / Bridge / River Modeling / Validation 0 Gathering support