Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 137 of 1370

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 7 months ago in InfoWorks ICM / Results 3 Gathering support

simulation .elog file available via UI

Prior to ICM 2025, right clicking on the completed simulation > Open As would give access to the "simulation log", which contained useful details about the initialisation and failure reasons of the simulation. It would also contain diagnostics ...
Iain Scott 4 months ago in InfoWorks ICM / Results 1 Under consideration

Use tracers for water on mesh elements

Our clients are more and more trying to figure out if damage to a property is caused by water from the public area (which is the responsibility of the client) or from private areas (which is not). When rainfall on mesh can pick up a tracer (eg. fr...
Marcel Glasbergen over 3 years ago in InfoWorks ICM / 2D Flooding / Visualization / Water Quality 1 Gathering support

It will great if we can control the display of the labels in ICM to have a better visualization.

For example : the possiblity of changing the precision in the labels (the decimal number of the value )
Guest almost 4 years ago in InfoWorks ICM / Visualization 3 Gathering support

Extra Results Outputs for some features in ICM

Hi there - Doing some work for a client I found the following limitations in results exports from Infoworks ICM: 2D Base Linear Structure: ls_underflow and ls_overflow results variables cannot have a summary of peak value exported by CSV or SHP. T...
Guest 8 months ago in InfoWorks ICM / Results 0 For Review

Pause simulations during server restarts

Please could we have an ability to auto-pause simulations whilst an InfoWorks ICM server is restarted? As part of the wider drive to reduce CSO spills there is an increasing need to run long time series through sewer models. This can require model...
Tom Walker almost 3 years ago in InfoWorks ICM / Simulations 2 Gathering support

Time series results for thematic maps

In the current state you need to add simulation results to a model and then preform a SQL to add a TSR result to a userfield. It would be easier to just add TSR results to the thematic SQL options.
Farhan Meke over 1 year ago in InfoWorks ICM / Theme 3 Under consideration

Displaying GIS layers above network objects

In ICM, files added through the GIS layer control dialog are displayed below the objects. Could you add a feature to display them above the objects? For example, when representing roads with shp files, displaying these backgrounds above the object...
Nami Ikarashi 8 months ago in InfoWorks ICM / GIS Layers 1 For Review