Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 140 of 1370

Improve "update from live data" performance

big models with many live data points connected to control takes a long time to update.
Pieter Piens over 3 years ago in InfoWorks WS Pro 0 Gathering support

Optimize PRV Settings, including flow modulated PRVs

I want a tool that can help define the minimum pressure setting at a PRV to provide required pressure to downstream customers under expected demands. In addition, in cases where I have flow modulated PRV's, I want the tool to provide a curve of pr...
Guest about 4 years ago in InfoWorks WS Pro / Automation 0 Gathering support

As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.

Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (...
Andy Chan about 6 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest over 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Validation of Bridge data

When a model is validated, it doesn't pick up on problems with bridges, that prevent the model from running. For example, the error "bed section is above soffit" is given when trying to run the model, but does not appear in the validation messages...
Guest about 5 years ago in InfoWorks ICM / Bridge / River Modeling / Validation 0 Gathering support

roll back commit history

We can see what the commit history is, but if you made a mistake and committed it there's no way to go back without making a new branch. Would be good to be able to roll back changes to a selected point in the commit history so your mistake isn't...
Ben Davies over 3 years ago in InfoWorks WS Pro 1 Gathering support

snap river reach lines to cross sections

When creating river reach links the vertices should snap to cross sections so that vertices are only created on the cross-section lines (if vertices are to close on river reach objects you get meshing problems later on!) and is easier to follow th...
Guest about 2 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Available flow capacity analysis with relative pressure drop tolerance

We want to evaluate how much additional demand flow can be pulled from each node independently, while ensuring that no node or customer in the system drops by more than 1 meter of minimum pressure.
Nathan Gerdts 9 months ago in InfoWorks WS Pro / Automation 0 Gathering support

Add tool to convert coordinates

Similar to "Convert flow units" and "Convert pressure units" under"Tools", it would be useful to have "Convert Coordinate Units". Coordinates in InfoWorks are meter/feet. Other websites like google maps uses decimal degree. It would be useful to h...
Mohammed Abdallah over 1 year ago in InfoWorks WS Pro / Productivity 0 For Review

graph all sources on a singe graph in quality runs

The graphing tool in a quality run now only alows for two different sources. but I would like to know the consistency of water on any point in time of all defined scource nodes. E.G. the consistency of node X is 36% from source X, 13% from source ...
Pieter Piens almost 4 years ago in InfoWorks WS Pro / Water Quality 0 Gathering support