Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 115 of 1370

Improve print layout functionality

The print layout functionality is incredibly basic and hasn't been improved for several years. At present, we tend to export results out of Infoworks and use 3rd party GIS to produce figures as the Infoworks layout tool isn't sufficient to create ...
Unknown Unknown over 1 year ago in InfoWorks ICM / Printing 1 Gathering support

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Update Custom Graph functionality to cover more results

The current custom graph options, including Observed/Predicted and Flexible reports don't cover the full range of results available inside of ICM. This makes creating graphs and reporting the results difficult especially in the River and Water Qua...
Alex Grist about 1 year ago in InfoWorks ICM / Reporting 1 Gathering support

Importing PFDs as Images for P&ID visualization

A paramount feature of this tool lies in its capability to incorporate P&IDs or PFDs in PDF format. Presently, there exists a limitation wherein P&IDs or PFDs cannot be uploaded as PDFs. The ability to upload PDFs would be transformative, ...
Javier Coronado 10 months ago in Info360 Insight / Images 1 For Review

Deterministic pump optimization +AI

physics based optimization of pumps coupled with ai tools that can support faster analytics
Guest about 2 years ago in Info360 Insight / Tools / Analytics 0 In progress

Add support for nodes in Infoworks ICM "custom graph observed/predicted report" to compare water level

I would like to compare predicted(sim) and observed values at nodes for level. Currently the report only supports links, and the closest thing is the pipe depth at the node.
Mel Meng over 1 year ago in InfoWorks ICM / Reporting 0 Gathering support

Histograms

The first step toward industrial optimization is establishing a baseline performance. In plants, histograms visualize historical performance statically. The shape of KPI histograms allows quickly establishing operation performance, i.e. high varia...
Javier Coronado 10 months ago in Info360 Insight / Data 0 For Review

Status Transfer for Critical Channels in Info360 Plant

To enable Info360 Plant to transfer a "status" for channels, allowing users to establish when a critical channel is missing data. Current Situation: Info360 Plant currently has value mapping capabilities, but there are limitations: Setting the val...
Javier Coronado 9 months ago in Info360 Insight / Admin / Global Changes 0 For Review

Change formatting of '2D level boundary below ground level' in the timestep log

Other warnings such as manhole shaft/chamber area occur with only one line of text with the '(and possibly others)' text. Could something similar be introduced for the '2D level boundary below ground level' warning in the timestep log? This warnin...
Tom Newman 9 months ago in InfoWorks ICM / Reporting 0 For Review

Adding references to Analytics

An analytic is created to be referred within other instance in the platform, whether another analytic or a workspace. When the analytic is created and later modified or deleted, the analytic owner must understand the impact of such modification or...
Javier Coronado 10 months ago in Info360 Insight / Tools / Analytics 0 Gathering support