Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 251 of 1370

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body almost 6 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest almost 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Remember/Fix Toolbar positions

When moving window from fullscreen to half/split-screen all the toolbars are moved to fit half screen width. When returning to fullscreen the toolbars remain in their split-screen positions. This makes finding tools challenging, takes up more scre...
Matthew Paul about 1 year ago in InfoWorks ICM / Productivity 1 Under consideration

Allow grid view produced by a SQL script to interact with GeoPlan

Allow grid view produced by a SQL script to interact with GeoPlan so users can right click on SQL elements and zoom to/navigate to the selection on the GeoPlan.
Karen Chu 8 months ago in InfoWorks ICM / SQL 4 Gathering support

Be able to create selection lists using ICM Exchange from a list of Node or link IDs

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity 1 Gathering support

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi 8 months ago in InfoWorks ICM / Validation 0 For Review

Have all the functionality available in the 'Manage scenarios' dialogue in the ICM, to also be available via ICM Exchange

Options such as 'Reintegrate' & Duplicate'
Guest over 5 years ago in InfoWorks ICM / API / Exchange 0 Gathering support

Give a warning when copying between networks with different user defined defaults

when copying for example conduits between networks with flags #D for headloss and roughness, the values are adapted to the user defined values in the new network. This can be confusing.
Guest almost 3 years ago in InfoWorks ICM / Flags / Import data / Productivity 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest almost 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest over 4 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support