Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 106 of 1442

Graph sum of multiple objects instead of each selected object

While looking at multiple drainage areas in a basin (in my example), results can become hard to read; it would be nice if you could graph multiple objects and have the option to see the summation of the selection instead of each individual item.
Andrew (AJ) Czubai about 3 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Modelling of Septicity

As a sewer modeller I have occasionally been asked about odour generation in sewer networks. I have noticed that DO (dissolved oxygen) and BOD (biochemical oxygen demand) are both inputs in the wastewater and trade-waste model groups of Infoworks ...
Guest over 6 years ago in InfoWorks ICM / Results / Simulations / Water Quality 0 Gathering support

Statistic Report Enhancement

Provide a way to enhance the statistical report to allow specific criteria above a threshold.
Guest over 6 years ago in InfoWorks ICM / Reporting / Statistics 0 Gathering support

ICMLive Viewer Licence

The ICM licence does not allow for the contents of Live groups to be seen. This has implications for the viewer licence. I would like to be able to access (but not edit) the contents of a live group. Can there therefore be an ICMLive Configuration...
Richard Body almost 5 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Export both the result and the underlying property fields

When the model results are displayed on the webpage through Exchange, since the basic properties need to be viewed, the corresponding basic properties of the results need to be exported first, and then the results are matched to the basic properti...
Liu Qiusheng about 5 years ago in InfoWorks ICM / Export Data / Simulations 0 Gathering support

Convergence Errors be resolved automatically while the model is simulated

Sometime a TSR running for few weeks throws up convergence hence these sims need to be rerun with shorter timestep which is both inefficient and a lot of time is wasted. It would be good if somehow the simulations dialog allowed to run the model w...
Salam Jamadar about 5 years ago in InfoWorks ICM / Performance / Simulations 0 Gathering support

Report showing history of simulation jobs running on server over a period of time

We are aware that ICM simulation jobs that are currently running on a simulation server can be viewed in the agent.state file in D:\Innovyze\InfoWorksAgent on the server. It would be great if there were a report that could show the history of ...
Mark Huxtable almost 2 years ago in InfoWorks ICM / Statistics 0 Gathering support

Document how results pfc vs r.pfc are calculated for open channels

in the long plots we ask for two capacities, we get pfc vs r.pfc for pipes they are the same , but for open channels such a trapezoidal they are different. there seems to be no literature on this.
John Krpan almost 2 years ago in InfoWorks ICM / Results 3 Will not implement

Export results to CSV/Database with a more flexible selection list in ICMLive

In ICMLive, we can now export results to CSV/Database with a pre-defined selection list. In ICM, we can have a more flexible way. For example if I hope to export results point (2D), initially I may have 1 million points. What we can do in ICM is, ...
Guest over 6 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward over 2 years ago in InfoWorks ICM / Results 2 Already exists