Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 57 of 1442

Alert Action Repetition Control - repeat action after alert has been active for Xnr runs

We have a model set up to process the EA's flood alerts and send out warnings when new ones become active. The model runs every 30 minutes, so we pick up the latest alerts and the repetition control is set to once so people don't become drowned in...
Geoffrey Brown about 6 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Copy/Paste Run Setup messages

Currently you cannot copy/paste setup error/warning messages from the Schedule Hydraulic Run Window in order to further investigate. This feature would be particularly useful for troubleshooting more complex runs ie TS.
Guest over 1 year ago in InfoWorks WS Pro / Productivity 0 For Review

Inclusion of FEH UK Rainfall Data

Can FEH rainfall data (all versions) be available to select just like it is for FRS data in the rainfall manager rather than having to retrieve these from another website. More and more authorities are asking for FEH data to be used
Guest over 1 year ago in InfoDrainage / Rainfall 1 For Review

Demand Area Analysis for partially metered areas

Demand Area Analysis was originally intended for networks where the unprofiled demand was unmetered. When domestic (unprofiled) metering became more prevalent Innovyze introduced “Current Average Specific Consumption (l/p/day)” in the calculation ...
Guest over 1 year ago in InfoWorks WS Pro / Productivity 2 For Review

ICMLive Viewer Licence

The ICM licence does not allow for the contents of Live groups to be seen. This has implications for the viewer licence. I would like to be able to access (but not edit) the contents of a live group. Can there therefore be an ICMLive Configuration...
Richard Body almost 5 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest about 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam almost 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott almost 2 years ago in InfoDrainage / Rainfall 1 For Review

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest almost 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Export results to CSV/Database with a more flexible selection list in ICMLive

In ICMLive, we can now export results to CSV/Database with a pre-defined selection list. In ICM, we can have a more flexible way. For example if I hope to export results point (2D), initially I may have 1 million points. What we can do in ICM is, ...
Guest over 6 years ago in InfoWorks ICM / Live Modeling 0 Gathering support