Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 338 of 1370

Variable baseflow

(Could also be considered hydraulics) On large scale projects where we may have limited information and funding, we assume baseflow values through an upstream point inflow. It would be beneficial to have a variable baseflow input per design storm....
Jess Ewing almost 2 years ago in InfoDrainage / Hydrology 1 Gathering support

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest about 1 year ago in InfoDrainage / Productivity 1 Gathering support

add Xylem Nexicom Smart System to control pumps as a modelling option

we are increasing using Xylem Nexicom Smart System to control pumps in pumping stations across Scotland. This smart control system includes an number of functions such as Energy Minimizer and Sup and pipe cleaning . Scottish Water has found diffic...
francisco simon 7 months ago in InfoWorks ICM / RTC 1 Will not implement

Schematic for Dry Wells

When adding a dry well, it would be useful to provide some labelled images like those available for other stormwater controls to clarify what the properties are refering to.
Midori Patterson almost 2 years ago in InfoDrainage / Visualization 1 Gathering support

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

RTC updated to support scripting

It would be good to have RTCs available through direct scripting rather than through the RTC editor alone.
Ann Pugh about 6 years ago in InfoWorks ICM / API / Exchange / RTC 1 Gathering support

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest about 1 year ago in InfoDrainage / Productivity 0 For Review

Assign Channel shape from ground model using cross section

In ICM I can sample elevations from ground model to cross section line and use that for river reaches, but sometimes I just want to use simple Channel links or maybe I'm using the SWMM engine which doesn't have rivers. I want to pull the channel ...
Guest almost 5 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support