Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 338 of 1372

Setting styles during Civil 3D import

It would be great to be able to set the style to pipes and structures during the import process from InfoDrainage into Civil 3D.
Guest 10 months ago in InfoDrainage / Civil3D Integration 0 For Review

Merge Phases

It would make life much easier if there was the ability to merge multiple phases together, instead of having to duplicate elements between phases. Duplication doesn't wholly work because connections can't be duplicated between phases.
Guest 10 months ago in InfoDrainage / Data Exchange 0 For Review

Update CAD data dynamically when updating externally (ie in C3D)

When you have cad data imported to an Infodrainage model you can’t update the data without it being closed i.e. in the example below I have the same drawing open in Civils 3D. So when a change is made and saved if you click reload cad data in Info...
Guest 10 months ago in InfoDrainage / Civil3D Integration 0 For Review

dendric numbering and table of results

its frustrating when interrogating and amending the pipe network, when the pipes and chambers are not in the same order, the way it was presented in MicroDrainage gave a clear path with the final outfall pipe being at the bottom, not randomly plac...
Steven Gilchrist over 2 years ago in InfoDrainage / Reporting 1 Under consideration

Pump Station Modelling

Infoworks ICM pump station modelling principle is very basic, adding a pump between two nodes is highly hypothetical. There is no way to add pump station head losses. I would like to suggest incorporating pump station modelling (for Rotodynamic pu...
Guest over 3 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Conveyance on cross section lines

Provide cross section conveyance for each cross section
Guest about 6 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support

Flow Path (Profile Plots)

Would love a plot setting to show which design storm is being run as it relates to the max. water level
Jess Ewing over 1 year ago in InfoDrainage / Reporting 2 Gathering support

Insert contours at regular intervals instead of "double pegs"

Currently, contours can be added at irregular intervals by using the "double pegs" function in InfoDrainage. In reality, contours are always placed at regular intervals, such as a major contour at every 10 ft or 5 ft of elevation. The option to ad...
Daniel'le DeVoss over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Lock pipe diameters only.

After simulation and there is flooding, trying to upsize the pipes, if the wizard is run again it reverts to the previous diameter, i dont want to lock (ALL) as i still want to use the wizard to lower the inverts etc, downstream.
Steven Gilchrist over 1 year ago in InfoDrainage / Hydraulics 3 Gathering support

RTC - New time range to allow "between 2 dates" every year

In a similar way to the way "time repeat" works, can we have an RTC range that works between the same 2 dates every year. I have a catchment where the operating protocol works differently in the Bathing Season from the rest of the year. Having a w...
John Sourbutts about 6 years ago in InfoWorks ICM / RTC 0 Gathering support