Skip to Main Content
Autodesk
ADD A NEW IDEA

Results

Showing 2

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker 8 months ago in InfoWorks ICM / Results 1 Already exists

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 1 year ago in InfoWorks ICM / Results 2 Already exists